Bunker Road Barrier Removals
#15-1101 #15-1101
Organization Chehalis Basin Lead Entity
Sponsor Lewis Conservation District
Status Completed
Schedule Start Date: 12/9/2015 End Date: 4/18/2019
Category Category: Restoration
DESCRIPTION
For many years, culverts 1404W19D and 1404W19C have been plugged, causing Bunker Creek to flow down Bunker Road for 600 feet. Fish have to wait until high water to swim up the road and get back into the stream. Since 2010 the road has been closed to vehicles from October 15 to April 15. However, the water still flows down the road in the summer and it is impossible to not run over coho fry. There is a private landowner at the end of the road who needs to access his property from this road. A private timber road branches off this road in the area between the two culverts. Decommissioning the road has been discussed but it is not an option due to access issues. Much work has been done by the Conservation District (CD) in the Bunker Creek Basin including farm planning, building a manure storage structure and replacing a mainstem barrier in 2014. The CD has planted 114.5 areas of riparian buffers with CREP protecting 6.11 miles of stream. These are the final barriers on the mainstem of Bunker Creek.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/11/2015Lewis Conservation DistrictMatch$50,500.00
Requested08/11/2015Recreation and Conservation Office (RCO)Salmon State Projects$198,933.00
Allocated04/18/2019Lewis Conservation DistrictMatch$8,834.32
Allocated04/18/2019Recreation and Conservation Office (RCO)CBS Habitat Rest. Project$37,920.00
Allocated04/18/2019Recreation and Conservation Office (RCO)Salmon Federal Projects$128,410.32
Spent11/21/2017Recreation and Conservation Office (RCO)CBS Habitat Rest. Project-$37,920.00
Spent04/18/2019Lewis Conservation DistrictMatch-$8,834.32
Spent04/18/2019Recreation and Conservation Office (RCO)Salmon Federal Projects-$128,410.32
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$175,165.00 $249,433.00 $175,164.64 $175,164.64 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chehalis GSU:Bunker Cr
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Southwest Washington, Not Determined
County:Lewis
HUC12:Bunker Creek (171001030109)
HUC8:Upper Chehalis (17100103)
Lead Entity Area:Chehalis Basin
Legislative District:19
Salmon Recovery Regions:Washington Coast
Sections:19
Sections:20
Steelhead-Pop (ESU):Steelhead-Washington Coast, Not Warranted
Township:T14NR04W
Watershed Administrative Unit:Bunker Creek
WRIA:Upper Chehalis
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.20mi0.15mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
3.40mi3.40mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
2.002.00
Square Miles Of streambed made accessible (C.2.b.2)
0.10sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
3.29mi
Number of bridges (C.2.g.2)
1.00
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
3.40mi0.11mi
Number of culverts (C.2.f.2)
3.001.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.00mi0.15mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
3.00acres3.00acres
Instream Pools Created/Added (C.4.c.6)
0.000.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.10mi0.15mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.26mi
Number of structures placed in channel (C.4.d.7)
25.00
Pools Created through channel structure placement (C.4.d.5)
5.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
1.10acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.26mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.10acres
Miles of streambank planted (C.5.c.4)
0.26mi