MF - Porter Creek Reach Phase 1
#15-1286 #15-1286
Organization WRIA 1 Watershed Management Board
Sponsor Lummi Nation
Status Completed
Schedule Start Date: 12/9/2015 End Date: 9/24/2018
Category Category: Restoration
Project Photo
DESCRIPTION
The Porter Reach Phase I In-stream Restoration Project is located between river miles 4.5 and 4.95 on the main stem of the Middle Fork Nooksack. The Lummi Nation will use this grant to construct 11 engineered log jams (ELJs) in the mainstem Middle Fork Nooksack River, consisting of three Type I ELJs (42x80x6'), two Type II ELJs (30x60x6'), and six Type III ELJs (34x75x4'). Endangered early spring Chinook salmon and bull trout will benefit from 11 primary pools; more pools may develop indirectly as increased roughness causes dynamic equilibrium. Scour pools provide thermal refugia (holding pools) from elevated Middle Fork water temperatures during summer spawning months in addition to pools for juvenile overwintering (rearing pools). In addition, juveniles will benefit from 1.23 miles of off channel rearing habitat by increasing connectivity with the floodplain and side channels. All features are focused on enhancement of endangered Spring Chinook (Oncorhynchus tshawytscha) habitat by maximizing natural habitat-forming processes inherent in this reach of river.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/04/2015Lummi NationMatch$155,657.00
Requested08/04/2015Recreation and Conservation Office (RCO)Salmon State Projects$867,114.00
Allocated09/20/2018Lummi NationMatch$155,657.00
Allocated09/20/2018Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$646,133.46
Spent09/14/2018Lummi NationMatch-$155,657.00
Spent09/14/2018Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$646,133.46
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,022,771.00 $1,022,771.00 $801,790.46 $801,790.46 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, North Fork Nooksack River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Whatcom
HUC12:Lower Middle Fork Nooksack River (171100040304)
HUC8:Nooksack (17110004)
Lead Entity Area:WRIA 1
Legislative District:42
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:San Juan Islands
Salmon Recovery Regions:Puget Sound
Sections:02
Sections:14
Steelhead-Pop (ESU):Steelhead-Puget Sound, Nooksack River, Threatened
Township:T38NR05E
Watershed Administrative Unit:Porter Canyon
WRIA:Nooksack
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
1.10mi1.10mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.10mi1.10mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
5.00acres5.00acres
Instream Pools Created/Added (C.4.c.6)
11.0011.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.15mi0.15mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.95mi0.95mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.60acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
1.10mi1.10mi
Number of structures placed in channel (C.4.d.7)
11.0011.00
Pools Created through channel structure placement (C.4.d.5)
10.0010.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
457.00yd
ADDITIONAL INFORMATION