Focus on the North Fork: Side Channels
#05-1450 #05-1450
Organization WRIA 1 Watershed Management Board
Sponsor Whatcom Land Trust (WLT)
Status Completed
Schedule Start Date: 1/30/2006 End Date: 1/6/2011
Category Category: Acquisition & Restoration
DESCRIPTION
Whatcom Land Trust used this funding for the project “Focus on the North Fork: Side Channels,” which acquired 42.35 acres of river frontage and side-channel habitat on the North Fork Nooksack. The two parcels acquired were a 17.35-acre tract at RM 49 with 1,300 feet of river frontage, side channels and small islands, and a 25-acre parcel at RM 42 on Bell Creek and the North Fork with 1,800 feet of frontage, forested side channels. and islands. The project included riparian restoration of 34 acres of habitat on the two purchased properties and on a previously acquired 78-acre site on Maple Creek. A feasibility review and preliminary design of restoration opportunities on the three properties was completed by Lummi Natural Resources to address limiting factors. The 17-acre tract was acquired by Whatcom Land Trust in 2005 and is offered as partial match for this project. The 25-acre Bell Creek tract is desirable for rural development and is zoned for three home sites. The majority of this parcel is located in the floodplain of the North Fork. Channel stability, habitat diversity, and reducing sediment load are limiting factors for Chinook salmon along this reach of the river. The restoration portion of this project addressed these problems through the re-establishment of riparian conifer forests and feasibility review for construction of in-stream wood structures. Acquisition of the project sites prevents development in the floodplain, prevents removal of riparian forest, reduces storm-water runoff, and protects habitat from possible flood control efforts.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/29/2005Whatcom Land Trust (WLT)Match$70,220.00
Requested09/29/2005Recreation and Conservation Office (RCO)Salmon State Projects$406,218.00
Allocated01/06/2011Whatcom Land Trust (WLT)Match$71,258.83
Allocated01/06/2011Recreation and Conservation Office (RCO)Salmon Federal Projects$400,986.36
Spent12/22/2010Whatcom Land Trust (WLT)Match-$71,258.83
Spent12/22/2010Recreation and Conservation Office (RCO)Salmon Federal Projects-$400,986.36
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$472,245.19 $476,438.00 $472,245.19 $472,245.19 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, North Fork Nooksack River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Maple Falls
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Whatcom
HUC12:Bell Creek-North Fork Nooksack River (171100040203)
HUC12:Maple Creek-North Fork Nooksack River (171100040201)
HUC8:Nooksack (17110004)
Lead Entity Area:WRIA 1
Legislative District:42
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:San Juan Islands
Salmon Recovery Regions:Puget Sound
Sections:01
Sections:21
Sections:22
Sections:27
Sections:28
Sections:31
Sections:36
Steelhead-Pop (ESU):Steelhead-Puget Sound, Nooksack River, Threatened
Township:T39NR05E
Township:T40NR05E
Township:T40NR06E
Watershed Administrative Unit:Boulder Creek
Watershed Administrative Unit:Deming
Watershed Administrative Unit:Warnick
WRIA:Nooksack
View project on a larger map
  APPLICATION FINAL 
ACQUISTION METRICS
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition
0.74mi1.25mi
 Land    
Acres by Acreage Type (fee simple)
Riparian
45.35
Total
45.35
acres
Riparian
32.85
Uplands
9.50
Wetlands
Total
42.35
acres
 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi1.75mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.04mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.10acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.04mi
Number of structures placed in channel (C.4.d.7)
7.00
Pools Created through channel structure placement (C.4.d.5)
3.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
6.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
34.00acres49.50acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.00mi2.25mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
39.50acres
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
0.00acres12.50acres