DESCRIPTION
The Cedar Creek Fish Passage Restoration Project restored fish passage to approx. 10 mi. of proposed bull trout Critical Habitat by removing the Cedar Creek Dam, reconstructing the stream channel, and restoring riparian vegetation. Other benefits of the project are: restored stream channel form and function, reduced water temperatures below the dam, and elimination of risk to public health/safety from potential dam failure. Cedar Creek is a tributary to the Pend Oreille River in northeastern Washington State (WRIA 62). Historically, bull trout from the Pend Oreille River and Lake Pend Oreille spawned and reared in WRIA 62 tributaries such as Cedar Creek. The Cedar Creek Dam has functioned as a barrier to fish migration for more than 50 years. In 1995 an adult bull trout was found above the dam and in 2003 an adult was found below the dam. This indicates that bull trout are utilizing the stream and that at least limited reproduction of resident bull trout has/is occurring above the dam. The Draft Bull Trout Recovery Plan (USFWS 2002) identifies restoration of fish passage at the Cedar Creek Dam as an action necessary for recovery of bull trout in the Pend Oreille Core Area. This project was identified in the Pend Oreille Lead Entity strategy as the top priority action for bull trout habitat restoration in the Cedar Creek subbasin, a high priority area in WRIA 62 (ranked #4 of 38 subbasins). The project enjoyed a high level of community support.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/16/2004Town of IoneMatch$127,966.00
Requested07/16/2004Recreation and Conservation Office (RCO)Salmon State Projects$725,144.00
Allocated10/07/2009Town of IoneMatch$176,377.65
Allocated10/07/2009Recreation and Conservation Office (RCO)Salmon State Projects$800,982.38
Spent11/18/2008Town of IoneMatch-$176,377.65
Spent11/18/2008Recreation and Conservation Office (RCO)Salmon State Projects-$800,982.38
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$972,084.38 $853,110.00 $977,360.03 $977,360.03 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
County:Pend Oreille
HUC12:Sweet Creek-Pend Oreille River (170102160902)
HUC8:Pend Oreille (17010216)
Lead Entity Area:Kalispel Tribe - Pend Oreille
Legislative District:07
Salmon Recovery Regions:Northeast Washington
Sections:36
Township:T38NR42E
Watershed Administrative Unit:Pend Oreille/Cedar Creek
WRIA:Pend Oreille
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.23mi0.23mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
12.00mi12.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.72sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Fishway chutes or pools installed (C.2.d.1)    
Number Of Fishway Chutes/Pools Installed (C.2.d.2)
0.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.25mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.00acres
Instream Pools Created/Added (C.4.c.6)
8.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.25mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.10acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.25mi
Number of structures placed in channel (C.4.d.7)
20.00
Pools Created through channel structure placement (C.4.d.5)
8.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
6.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
2.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.50mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.00acres
Site Stewardship Project    
 Restored land maintained (C.11.c.1)    
Acres of restored land maintained (C.11.c.2)
0.00acres
ADDITIONAL INFORMATION
NOTES
PRISM Fiscal Year: 2004 PRISM Approval Date: 12/3/2004