Titus Creek Restoration
#07-1878 #07-1878
Organization Snake River Salmon Recovery Board Lead Entity
Sponsor Walla Walla Community College
Status Completed
Schedule Start Date: 1/1/2008 End Date: 9/19/2011
Category Category: Restoration
Project Photo
DESCRIPTION
This project abandoned a shallow cement pond, diverted the water into the natural channel, and established in-stream habitat improvements and native riparian buffers on Titus Creek. This essential fish habitat will be reconnected to Mill Creek in a later restoration project. This important stream reach is part of the Mill Creek MSA and has been identified by the PWPCC Sub-basin plan as having high potential for rearing for ESA listed summer steelhead and spring chinook. The pond heated water in this cold, spring-fed section of Titus Creek, a tributary to Mill Creek. Engineering work was done by Anderson Perry & Associates, Inc. An interdisciplinary team consisting of WDFW, Confederated Tribes of the Umatilla Indian Reservation, USACE, SRSRB, and RCO were instrumental in the completion of this project.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/14/2007Walla Walla Community CollegeMatch$28,000.00
Requested09/14/2007Recreation and Conservation Office (RCO)Salmon State Projects$153,901.00
Allocated09/19/2011Walla Walla Community CollegeMatch$35,785.59
Allocated09/19/2011Recreation and Conservation Office (RCO)Salmon Federal Projects$157,429.06
Spent09/19/2011Walla Walla Community CollegeMatch-$35,785.59
Spent09/19/2011Recreation and Conservation Office (RCO)Salmon Federal Projects-$157,429.06
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$181,901.00 $181,901.00 $193,214.65 $193,214.65 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Middle Columbia River Spring, Not Warranted
City Areas:Walla Walla
County:Walla Walla
HUC12:Lower Mill Creek (170701020204)
HUC8:Walla Walla (17070102)
Lead Entity Area:Snake River
Legislative District:16
Salmon Recovery Regions:Snake River
Sections:14
Sections:23
Snake Major Spawning Areas:Mill Creek-Walla Walla River
Steelhead-Pop (ESU):Steelhead-Middle Columbia River, Walla Walla River, Threatened
Township:T07NR36E
Watershed Administrative Unit:Walla Walla Agricultural Lands
WRIA:Walla Walla
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.20mi0.15mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.60mi0.15mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.10acres
Instream Pools Created/Added (C.4.c.6)
9.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.15mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.20acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.15mi
Number of structures placed in channel (C.4.d.7)
11.00
Pools Created through channel structure placement (C.4.d.5)
9.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
3.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.40mi0.30mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.50acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.15mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.30acres
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
0.50acres