Project Area 14 LW Restoration
#12-1641 #12-1641
Organization Snake River Salmon Recovery Board Lead Entity
Sponsor Department of Fish and Wildlife (WDFW)
Status Completed
Schedule Start Date: 12/6/2012 End Date: 4/25/2016
Category Category: Restoration
Project Photo
DESCRIPTION
Project area was identified as a tier 1 project in the Tucannon Conceptual Restoration Plan (Anchor QEA 2011 Nov) and Washington Department of Wildlife sponsored final design and implementation with completion in 2014. Project Area 14 was characterized by over simplified habitat lacking floodplain connectivity or in channel complexity. The 1.64 mile reach was treated with LWD (712 pieces >6m long & 0.30cm dia) to increase complexity and connectivity.  A variety of side channels were created and formed as a direct result of the project as well as the reconnection of floodplain. The project was designed by a SRFB grant managed by the SRSRB and implemented by Washington Department of Fish and Wildlife. The project was funded under the SRSRB Tucannon River Habitat Programmatic.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/17/2012Department of Fish and Wildlife (WDFW)Match$47,000.00
Requested08/17/2012Recreation and Conservation Office (RCO)Salmon State Projects$264,848.00
Allocated12/05/2012Department of Fish and Wildlife (WDFW)Match$47,000.00
Allocated12/05/2012Recreation and Conservation Office (RCO)Salmon Federal Projects$264,848.00
Spent04/25/2016Department of Fish and Wildlife (WDFW)Match-$47,000.00
Spent04/25/2016Recreation and Conservation Office (RCO)Salmon Federal Projects-$264,848.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,375,668.00 $311,848.00 $311,848.00 $311,848.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Snake River Spring/Summer, Tucannon River, Threatened
County:Columbia
HUC12:Cummings Creek (170601070604)
HUC12:Hartsock Grade-Tucannon River (170601070606)
HUC12:Little Tucannon River-Tucannon River (170601070603)
HUC8:Lower Snake-Tucannon (17060107)
Lead Entity Area:Snake River
Legislative District:09
Salmon Recovery Regions:Snake River
Sections:21
Sections:22
Sections:27
Snake Major Spawning Areas:Upper Tucannon River
Steelhead-Pop (ESU):Steelhead-Snake River, Tucannon River, Threatened
Township:T10NR41E
Watershed Administrative Unit:Tucannon
WRIA:Middle Snake
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.38mi1.64mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.38mi1.64mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.10acres17.80acres
Instream Pools Created/Added (C.4.c.6)
7.0015.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.04mi1.54mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.05mi1.60mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.20acres0.20acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.38mi1.64mi
Number of structures placed in channel (C.4.d.7)
19.0086.00
Pools Created through channel structure placement (C.4.d.5)
10.0010.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
17.00yd17.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.50acres4.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.04mi0.10mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.50acres4.00acres
Miles of streambank planted (C.5.c.4)
0.10mi
ADDITIONAL INFORMATION