Upper Klickitat R. Enhancement, Phase II
#06-2277 #06-2277
 WRIA 30 - Klickitat Basin Upper Klickitat Headwaters Upper Klickitat R. Enhancement, Phase II
Organization Klickitat Lead Entity
Sponsor Confederated Tribes and Bands of the Yakama Nation (YN)
Status Completed
Schedule Start Date: 1/1/2007 End Date: 9/12/2011
Category Category: Restoration
DESCRIPTION
The Upper Klickitat River In-Channel and Floodplain Enhancement Project -- Phase 2 enhanced spawning, rearing, and holding habitat for spring Chinook and steelhead along roughly 2.3 miles between river mile 70 and 75 of the Klickitat River. The project is located within the "Upper Klickitat Mainstem: McCreedy Creek (RM 70) to Diamond Fork" reach that is ranked in the top tier of priority geographic areas identified in the Klickitat Lead Entity Region Salmon Recovery Strategy. The project addressed limiting habitat features identified for this reach associated with pool frequency and quality, channel confinement, and floodplain connectivity. The project constructed 35 large woody debris (LWD) jams, reconnected and created 2,000 feet of side channel habitat, and stabilized almost a half mile (cumulative) of bank. Channel complexity was increased via enhancement of existing pools, construction of new pools, and construction of multiple LWD jams. Summer steelhead are listed as ESA-threatened and spring Chinook are listed as WDFW-depressed. Both stocks are identified as a Tier 1 priority species in the Recovery Strategy and will benefit from improved rearing, holding, and spawning conditions.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/14/2006Recreation and Conservation Office (RCO)Salmon State Projects$246,250.00
Requested09/14/2006Confederated Tribes and Bands of the Yakama Nation (YN)Match$461,953.00
Allocated07/20/2011Recreation and Conservation Office (RCO)Salmon Federal Projects$246,250.00
Allocated07/20/2011Confederated Tribes and Bands of the Yakama Nation (YN)Match$385,730.00
Spent09/12/2011Recreation and Conservation Office (RCO)Salmon Federal Projects-$246,250.00
Spent09/12/2011Confederated Tribes and Bands of the Yakama Nation (YN)Match-$385,730.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$708,203.00 $708,203.00 $631,980.00 $631,980.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Middle Columbia River Spring, Not Warranted
Chum-Pop (ESU):Chum-Columbia River, Upper Gorge Tributaries, Outside anadromous area
County:Yakima
HUC12:Swamp Creek-Klickitat River (170701060104)
HUC8:Klickitat (17070106)
Lead Entity Area:Klickitat County
Legislative District:14
Salmon Recovery Regions:Middle Columbia River
Sections:25
Steelhead-Pop (ESU):Steelhead-Middle Columbia River, Klickitat River, Threatened
Township:T10NR12E
Watershed Administrative Unit:McGreedy Creek
WRIA:Klickitat
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
2.78mi0.83mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.80acres
Instream Pools Created/Added (C.4.c.6)
15.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.54mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.83mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
1.20acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.83mi
Number of structures placed in channel (C.4.d.7)
35.00
Pools Created through channel structure placement (C.4.d.5)
15.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
15.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.48mi0.28mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
86.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.28mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.70acres
ADDITIONAL INFORMATION