Organization | Yakima Basin Fish and Wildlife Recovery Board Lead Entity |
Sponsor | |
Status | Planned |
Schedule | Start Date: 2/14/2023 End Date: 2/14/2026 |
Category | Category: |
There has been a long history of work to protect lands in the Cowiche watershed from development. Cowiche Creek is a less developed watershed adjacent to the City of Yakima facing development pressures. WDFW, the Cowiche Conservancy, the City of Yakima, and Yakima County have all worked to acquire lands and easements that protect open space, fish and wildflife habitat, and outdoor recreation opportunities.
Type | Date | Funding Org | Funding Program | Match | Amount |
---|
Grant Project Agreement Totals | Proposed | Requested | Allocated | Spent | Balance |
Type | Date | Funding Org | Funding Program | Match | Amount |
---|
Other Funding Totals | Requested | Allocated | Spent | Balance | |
Grand Totals | Proposed | Requested | Allocated | Spent | Balance |
APPLICATION | FINAL | ||||
Miles of Stream and/or Shoreline Treated or Protected (C.0.b) | |||||
Fish Passage Improvement | |||||
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1) | |||||
*Number of blockages / impediments / barriers impeding passage (C.2.b.4) | |||||
Culvert installed or improved (C.2.f.1) | |||||
Miles of stream made accessible by culvert installation/repair (C.2.f.3) | |||||
Fish passage blockages removed or altered (C.2.c.1) | |||||
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2) | |||||
Road-crossing removal (C.2.i.1) | |||||
Miles of stream made accessible by road crossing removal (C.2.i.3) | |||||
Instream Habitat Project | |||||
Total Miles Of Instream Habitat Treated (C.4.b) | |||||
Channel reconfiguration and connectivity (C.4.c.1) | |||||
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5) | |||||
Instream Pools Created/Added (C.4.c.6) | |||||
Miles of Off-Channel Stream Created or Connected (C.4.c.4) | |||||
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3) | |||||
Channel structure placement (C.4.d.1) | |||||
Acres Of Streambed Treated for channel structure placement (C.4.d.4) | |||||
Miles of Stream Treated for channel structure placement (C.4.d.3) | |||||
Number of structures placed in channel (C.4.d.7) | |||||
Pools Created through channel structure placement (C.4.d.5) | |||||
Riparian Habitat Project | |||||
*Total Riparian Acres Treated (C.5.b.2) | |||||
*Total Riparian Miles Streambank Treated (C.5.b.1) | |||||
Planting (C.5.c.1) | |||||
Acres Planted in riparian (C.5.c.3) | |||||
Riparian Plant removal / control (C.5.h.1) | |||||
Acres of riparian treated for plant removal/control (C.5.h.3) | |||||
ACQUISTION METRICS | |||||
Real Property Acquisition | |||||
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition |
![]() | OIP.jfif |