DESCRIPTION
Dike setbacks and other projects that increase connectivity
between the channel and its floodplain or between the channel and existing
off-channel habitat. Does not include
digging artificial channels.
The Union Gap reach of the Yakima River between Naches River and Wapato Dam is
considered to have very high restoration potential. It is one of the only mainstem reaches that is
not currently limited by severely altered flow and temperature regimes. YRBWEP has purchased
large areas of floodplain habitat to the east of the river. The majority of this area is currently
isolated by levees and passage barriers. Yakima County Flood Control Zone District is
proposing to set back the levees in this reach to significantly increase the size of the active
floodplain, including on the YRBWEP properties. WSDOT has constructed a new bridge at SR
24 which is much longer than the old bridge to allow the levee setback to proceed. Floodplain
restoration work is being coordinated with Central Pre-mix's gravel mining operation.