Diversion 14 Fish Screen - Ahtanum Cr.
#02-1527 #02-1527
 Naches Ahtanum Diversion 14 Fish Screen - Ahtanum Cr.
Organization Yakima Basin Fish and Wildlife Recovery Board Lead Entity
Sponsor North Yakima Conservation District
Status Completed
Schedule Start Date: 5/6/2003 End Date: 9/27/2005
Category Category: Restoration
Project Photo
DESCRIPTION
The North Yakima Conservation District, with support from the Yakima Basin Tributary Access and Habitat Program (YBTAHP) participants, used this funding to implement fish screen design and improvements on Ahtanum Creek. Specifically, this project removed a fish passage barrier, screened an irrigation diversion, set back a flood control berm, and established riparian habitat. The district built nine vortex rock weir structures to provide irrigation diversion control and fish passage at all flow levels. The project also included construction and implementation of a 10 cfs rotary drum fish screen and a set back of an eight foot push up berm approximately 75 feet from the stream bank to allow for reconnection of the floodplain and restoration of the riparian vegetation community. This project had been identified by YBTAHP as a high priority early implementation project. Ahtanum Creek lies partially within the Yakama Nation, and it currently supports steelhead and bull trout, as well as Chinook and coho salmon, making it a high priority stream for fish passage and screening improvements. This unscreened diversion lay approximately 11 miles upstream from the confluence with the Yakima River and three miles downstream of the Ahtanum Irrigation District (AID) and the Wapato Irrigation Project (WIP) screen diversion. It was the last unscreened gravity diversion remaining on the Ahtanum Creek. All other diversions on the creek had been screened or converted to screened pump diversions. Cooperative work among the Ahtanum Irrigation District, the Wapato Irrigation Project, and fish management agencies have helped to maintain minimum fish passage water levels in the lower 14 miles of Ahtanum Creek.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested11/22/2002North Yakima Conservation DistrictMatch$42,961.00
Requested11/22/2002Recreation and Conservation Office (RCO)Salmon State Projects$199,000.00
Allocated09/26/2005North Yakima Conservation DistrictMatch$48,524.00
Allocated09/26/2005Recreation and Conservation Office (RCO)Salmon Federal Projects$218,900.00
Spent09/27/2005North Yakima Conservation DistrictMatch-$48,524.00
Spent09/27/2005Recreation and Conservation Office (RCO)Salmon Federal Projects-$218,900.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$267,424.00 $241,961.00 $267,424.00 $267,424.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
Chinook2-Pop (ESU):Chinook-Middle Columbia River Spring, Not Warranted
County:Yakima
HUC12:Lower Ahtanum Creek (170300030105)
HUC8:Lower Yakima (17030003)
Lead Entity Area:Yakima Basin
Legislative District:15
Salmon Recovery Regions:Middle Columbia River
Sections:16
Steelhead-Pop (ESU):Steelhead-Middle Columbia River, Naches River, Threatened
Township:T12NR17E
Watershed Administrative Unit:Lower Yakima West Side Agricultural Lands
WRIA:Lower Yakima
Yakima Subbasins:Ahtahum Creek
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.20mi0.14mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
3.00mi3.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.10sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Fishway chutes or pools installed (C.2.d.1)    
Number Of Fishway Chutes/Pools Installed (C.2.d.2)
9.00
Fish Screening Project    
Quantity Of Water Protected By Screens (acre feet per year) (C.1.b)
4,243.00acre-ft/yr
 Fish screens installed (C.1.c.1)    
Number Of Fish Screens Installed (C.1.c.2)
1.00
The Flow Rate Of Screened Water (C.1.c.3)
10.00cfs
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.14mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.10acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.14mi
Number of structures placed in channel (C.4.d.7)
9.00
Pools Created through channel structure placement (C.4.d.5)
9.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
4.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.14mi
Site Stewardship Project    
 Restored land maintained (C.11.c.1)    
Acres of restored land maintained (C.11.c.2)