Twisp Ponds: Design And Implementation B
#BPA-P-85755 #BPA-P-85755
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Methow Salmon Recovery Foundation
Status Completed
Schedule Start Date: 9/1/2020 End Date: 8/31/2021
Category Category: Restoration
DESCRIPTION
BPA Contract 85755. One of the project objectives is to build and expand on the engineering framework established in the first phase of the project that allowed MSRF to work directly with BPA technical staff to efficiently develop a preferred conceptual design.  MSRF plans to utilize this framework on several other upcoming targeted projects.  In the next phase this design will be finalized by the licensed professional engineer selected under the previous contract.

Project is intended to restore a perennial connection to the Twisp Ponds side channel network flowing from an existing connection to the Twisp River at River Mile 1.5.  This project will increase the resilience of off-channel rearing habitat for juvenile spring Chinook and steelhead by providing a perennial connection to the Twisp Ponds side channel network.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/01/2020Bonneville Power Administration (BPA)Upper Columbia Programmatic$149,020.00
Allocated09/01/2020Bonneville Power Administration (BPA)Upper Columbia Programmatic$149,020.00
Spent08/31/2021Bonneville Power Administration (BPA)Upper Columbia Programmatic-$147,610.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$149,020.00 $149,020.00 $149,020.00 $147,610.00 $1,410.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Methow River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Okanogan
HUC12:Lower Twisp River (170200080509)
HUC8:Methow (17020008)
Lead Entity Area:Upper Columbia
Legislative District:07
Salmon Recovery Regions:Upper Columbia River
Sections:12
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Methow River, Threatened
Township:T33NR21E
Upper Columbia Assesment Unit:Lower Twisp River
Watershed Administrative Unit:Twisp
WRIA:Methow