Entiat IMW –Dillwater Project
#12-1757 #12-1757
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Natural Resources Department
Status Completed
Schedule Start Date: 8/1/2012 End Date: 7/15/2014
Category Category: Monitoring
DESCRIPTION
This project provided funding to monitor an ELJ project in the Upper Entiat. The ELJ project constructed 5 Engineered Log Jams (ELJ) in the Upper Entiat River (Figures 8, and 10-15). Each ELJ structure consists of 25-50 conifer trees with and without root wads. The logs range in size from 14-36 inches in diameter and vary in length from 12-60 feet. There are 2 types of log jams: bank oriented/deflector and mid-channel/bar apex. Each structure is sited in a specific location to achieve maximum biological benefit and is largely based on a detailed USFWS geomorphic analysis (USFWS, unpublished data). ELJ designs are based on a 2010 USFWS survey of natural log jams in the White River (USFWS, 2011). This funding allowed for: - Quarterly site visits by two staff for photo documentation - Staff time to reduce survey data and produce drawings - Staff visits during high glow events to monitor structures and identify downstream impacts - Site visits with emergency responders (one year post-construction) for evaluation of any changes
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested06/18/2012Recreation and Conservation Office (RCO)Pacific States Projects$7,500.00
Allocated07/15/2014Recreation and Conservation Office (RCO)Pacific States Projects$5,998.66
Spent11/07/2013Chelan County Natural Resources DepartmentMatch-$0.00
Spent11/07/2013Recreation and Conservation Office (RCO)Pacific States Projects-$5,998.66
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$5,998.66 $7,500.00 $5,998.66 $5,998.66 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Entiat River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Mills Creek-Entiat River (170200100209)
HUC8:Upper Columbia-Entiat (17020010)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:28
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Entiat River, Threatened
Township:T26NR20E
Upper Columbia Assesment Unit:Entiat River-Mills Creek
Watershed Administrative Unit:Lower Entiat
WRIA:Entiat
View project on a larger map

Related Projects