Entiat River Foreman Floodplain Connection
#09-1626 #09-1626
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Natural Resources Department
Status Dormant
Schedule Start Date: 12/10/2009 End Date: 12/31/2012
Category Category: Restoration
DESCRIPTION
The Entiat River Foreman Floodplain Reconnection Project will increase habitat diversity and off-channel rearing and refuge opportunities for juvenile steelhead and spring Chinook salmon on the lower Entiat River between RM 2.7 and 2.3 where the construction of two levees has resulted in the channelization of the main channel and disconnection of adjacent floodplain. The project was identified through the US Bureau of Reclamation’s Keystone Canyon Project Floodplain Features and Alternatives Report (USBR 2007) and their Tributary Assessment studies on the Entiat River (USBR 2009). The proposed action is to selectively remove 325’ of existing levees to reconnect flood flows to a 5.4-acre forested floodplain habitat and deepen an existing wetland/swale to create 1100’ of side channel habitat. The project will meet the biological goal of increasing floodplain connectivity and off-channel refuge and rearing habitats, and should lead to improved salmonid abundance and productivity for multiple ESA-listed species. This addresses Tier 1 habitat restoration as recommended in the Biological Strategy (UCRTT 2008) and Recovery Plan (UCSRB 2007) for the Entiat River. The lower Entiat River is a Category 2 watershed in the Entiat Subbasin, which contains major spawning areas for ESA-listed spring Chinook salmon and steelhead, and is a bull trout core area. The USBR is undertaking an Alternatives Evaluation at the project site in 2009. CCNRD expects to secure all necessary permits and complete project construction by September 2010.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/31/2009Chelan County Natural Resources DepartmentMatch$104,296.00
Requested08/31/2009Recreation and Conservation Office (RCO)Salmon State Projects$104,296.00
Allocated04/04/2014Recreation and Conservation Office (RCO)Salmon State Projects$7,789.40
Allocated04/04/2014Chelan County Natural Resources DepartmentMatch$104,296.00
SpentRecreation and Conservation Office (RCO)Salmon State Projects-$7,789.40
Spent11/19/2012Recreation and Conservation Office (RCO)Salmon Federal Projects-$0.00
Spent11/19/2012Chelan County Natural Resources DepartmentMatch-$104,296.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1.00 $208,592.00 $112,085.40 $112,085.40 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Entiat River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Mills Creek-Entiat River (170200100209)
HUC8:Upper Columbia-Entiat (17020010)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:13
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Entiat River, Threatened
Township:T25NR20E
Upper Columbia Assesment Unit:Entiat River-Mills Creek
Watershed Administrative Unit:Lower Entiat
WRIA:Entiat
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.20mi0.00mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
0.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.20mi0.00mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.00acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.00mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.00mi
Number of structures placed in channel (C.4.d.7)
0.00
Pools Created through channel structure placement (C.4.d.5)
0.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
0.00yd
 Plant removal/control (C.4.g.1)    
Acres of Streambed Treated for plant removal/control (C.4.g.4)
0.00acres
Miles of Stream Treated for plant removal/control (C.4.g.3)
0.00mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.00mi
Wetland Project    
Total Acres Of Wetland Area Treated (C.8.b)
5.40acres0.00acres
 Artificial wetland created (C.8.f.1)    
Artificial Wetland Acres Created (C.8.f.2)
0.00acres0.00acres
 Wetland plant removal / control (C.8.d.1)    
Acres of wetland treated for plant removal/control (C.8.d.3)
0.00acres0.00acres