CCD Yaksum Creek Riparian Enhancement
#SRP-09-14458 #SRP-09-14458
 Wenatchee Sub-basin Mission Creek CCD Yaksum Creek Riparian Enhancement
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Cascadia Conservation District
Status Completed
Schedule Start Date: 4/27/2009 End Date: 12/31/2010
Category Category: Restoration
Project Photo
DESCRIPTION
This project re-meanders a ditched, straightened segment of Yaksum Creek. The project site was also planted with riparian vegetation. The project site was cleared in the 1950's and Yaksum Creek was ditched and put in a wooden pipe wrapped with steel wire to allow fruit trees planted and farmed in the Canyon. The site proved unsuitable for fruit trees, and the orchard was eventually pulled.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Allocated06/03/2010Department of Ecology (ECY)$22,500.00
Allocated06/03/2010US Bureau of Reclamation$2,500.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$25,000.00 $0.00 $25,000.00 $0.00 $25,000.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Wenatchee River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Brender Creek-Mission Creek (170200110604)
HUC8:Wenatchee (17020011)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:09
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Wenatchee River, Threatened
Township:T23NR19E
Upper Columbia Assesment Unit:Mission Creek-Brender Creek
Watershed Administrative Unit:Lower Mission Creek
WRIA:Wenatchee
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Fish Passage Improvement    
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.001.00
Floodplain Project    
 Floodplain Improvement    
Linear feet of channel connectivity/rehabilitation/creation within the floodplain
210.00linear ft210.00linear ft
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.02mi0.02mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Instream Pools Created/Added (C.4.c.6)
3.003.00
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.02mi0.02mi
Number of structures placed in channel (C.4.d.7)
3.003.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.00acres0.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.04mi0.04mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.30acres0.30acres
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
ADDITIONAL INFORMATION