Salmon Creek Riparian Restoration
#99-1308 #99-1308
 Okanogan Sub-basin Lower Salmon Creek Salmon Creek Riparian Restoration
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor City of Okanogan
Status Completed
Schedule Start Date: 7/29/1999 End Date: 8/20/2001
Category Category: Restoration
DESCRIPTION
The Salmon Creek Diversion Dam Design Project was a coordinated effort between the landowner, the irrigation system operator, and the Colville Tribes to compliment other planned fish recovery efforts on Salmon Creek by removing in-stream passage barriers, improving screens and diversion facilities, and increasing native riparian plantings. The project was developed in coordination with WDFW, NRCS, and the Colville Tribes.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/14/1999City of OkanoganMatch$11,500.00
Requested07/14/1999Recreation and Conservation Office (RCO)Salmon State Projects$40,000.00
Allocated08/20/2001City of OkanoganMatch$6,075.03
Allocated08/20/2001Recreation and Conservation Office (RCO)Salmon State Projects$35,856.78
Spent01/31/2001City of OkanoganMatch-$6,075.03
Spent01/31/2001Recreation and Conservation Office (RCO)Salmon State Projects-$35,856.78
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$51,500.00 $51,500.00 $41,931.81 $41,931.81 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Okanogan River, Threatened
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
City Areas:Okanogan
County:Okanogan
HUC12:Green Lake-Salmon Creek (170200062004)
HUC8:Okanogan (17020006)
Lead Entity Area:Upper Columbia
Legislative District:07
Salmon Recovery Regions:Upper Columbia River
Sections:08
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Okanogan River, Threatened
Township:T33NR26E
Upper Columbia Assesment Unit:Salmon Creek-Lower
Watershed Administrative Unit:Lower Salmon Creek
WRIA:Okanogan
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.06mi0.06mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
14.00mi14.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
3.00
Square Miles Of streambed made accessible (C.2.b.2)
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.00mi0.00mi
Number of culverts (C.2.f.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
3.003.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
14.00mi14.00mi
Number of road-crossings (C.2.i.2)
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
Miles of Stream Treated for channel structure placement (C.4.d.3)
Number of structures placed in channel (C.4.d.7)
Pools Created through channel structure placement (C.4.d.5)
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)