Dryden Fish Enhancement CMZ Project
#04-1461 #04-1461
 Wenatchee Sub-basin Lower Wenatchee Dryden Fish Enhancement CMZ Project
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Public Utilities District
Status Completed
Schedule Start Date: 1/1/2005 End Date: 7/8/2008
Category Category: Restoration
Project Photo
DESCRIPTION
The Dryden project is a cooperative habitat enhancement project designed to help endangered spring chinook, endangered summer steelhead trout and other salmonids within the lower Wentachee River. The project site is owned by WDFW and consists of 8.8 acres of floodplain and riparian shoreline located adjacent to the Wenatchee River. The site was mined as part of a gravel pit operation in the l950's. A dike isolates the property from the river along 1500 feet of riverfront. The project will breach a portion of the dike and construct an inlet structure and a series of inland channels. The inlet itself will be an open channel design and will be armored with native oversized round rock. Large rock, logs, and rootwads will be placed as habitat structures in the channels. Vegetation will be planted on the channel banks and all areas disturbed through construction. Development along the main stem Wenatchee River has caused significant loss of off-channel habitat and floodplain function. Much off-channel habitat has been taken out of salmonid production through past land use practices and stream habitat alterations and fragmentation. The objective of this project is to create prime, high quality, rear-round habitat, predator escape cover, and high flow refuge areas for salmonids.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/13/2004Chelan County Public Utilities DistrictMatch$34,000.00
Requested07/13/2004Recreation and Conservation Office (RCO)Salmon State Projects$146,000.00
Allocated07/08/2008Chelan County Public Utilities DistrictMatch$34,000.04
Allocated07/08/2008Recreation and Conservation Office (RCO)Salmon Federal Projects$145,750.35
Spent07/08/2008Chelan County Public Utilities DistrictMatch-$34,000.04
Spent07/08/2008Recreation and Conservation Office (RCO)Salmon Federal Projects-$145,750.35
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$179,750.39 $180,000.00 $179,750.39 $179,750.39 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Wenatchee River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Ollala Canyon-Wenatchee River (170200110707)
HUC8:Wenatchee (17020011)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:26
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Wenatchee River, Threatened
Township:T24NR18E
Upper Columbia Assesment Unit:Wenatchee River-Ollala Canyon
Watershed Administrative Unit:Lower Wenatchee
WRIA:Wenatchee
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.12mi0.12mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.20mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.10sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
0.00cfs
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.14mi0.14mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.20acres
Instream Pools Created/Added (C.4.c.6)
3.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.20mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.20mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
1.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.20mi
Number of structures placed in channel (C.4.d.7)
3.00
Pools Created through channel structure placement (C.4.d.5)
3.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
0.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.02mi0.02mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
1.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.20mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.20acres
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
0.20acres