DESCRIPTION
The Trout Unlimited Sportsman's Association sponsored the construction of a new floodplain and meandering channel for Beebe Creek, a small tributary to the Columbia River near Chelan Falls. The Association used a SRFB grant to reconfigure Beebe Creek to increase salmon spawning and rearing habitat. Beebe Creeke is spring-fed tributary to the Columbia River and it produces consistent quantities of cold water throughout the summer. The creek is home to steelhead trout and Chinook and coho salmon. Channelized for agricultural purposes, the creek flowed through a straight, ditch-like course with limited spawning gravel, little overhead cover and degraded riparian conditions. Work included constructing a new winding channel that more than doubling the length of the creek. The additional wetland and riparian areas created will protect this unique coldwater resource and enhance shoreline habitat complexity along the Columbia River. The sportsman's association contributed $279,948 in cash, a state grant, donated materials and volunteer labor. Requested funds would covered Phase 1 costs of investigations to select the optimal channel location and configuration, determine fish production potential, and to prepare engineering designs and site restoration plans for the new floodplain and meandering channel. The design produced in Phase 1 were used to construct (in Phase 2) a complex, low- to medium-gradient channel, at least four times longer than the existing channel, increasing the qua
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/29/2005Recreation and Conservation Office (RCO)Salmon State Projects$120,000.00
Requested09/29/2005Lake Chelan Sportsman's AssociationMatch$279,948.00
Allocated01/06/2006Recreation and Conservation Office (RCO)Salmon Federal Projects$120,000.00
Allocated01/06/2006Lake Chelan Sportsman's AssociationMatch$279,948.00
Spent05/04/2007Recreation and Conservation Office (RCO)Salmon Federal Projects-$120,000.00
Spent05/04/2007Lake Chelan Sportsman's AssociationMatch-$279,948.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$399,948.00 $399,948.00 $399,948.00 $399,948.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Long Draw-Columbia River (170200050507)
HUC8:Chief Joseph (17020005)
Legislative District:12
Salmon Recovery Regions:No Region
Sections:20
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Methow River, Threatened
Township:T27NR23E
Watershed Administrative Unit:Howard Flats
WRIA:Chelan
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.34mi0.34mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.19mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.19sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
2.00cfs
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.34mi0.34mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.20acres
Instream Pools Created/Added (C.4.c.6)
5.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.19mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.34mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.20acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.19mi
Number of structures placed in channel (C.4.d.7)
5.00
Pools Created through channel structure placement (C.4.d.5)
5.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
4.00yd
 Plant removal/control (C.4.g.1)    
Acres of Streambed Treated for plant removal/control (C.4.g.4)
0.00acres
Miles of Stream Treated for plant removal/control (C.4.g.3)
0.19mi
 Spawning gravel placement (C.4.f.1)    
Cubic Yards of spawning gravel placed (C.4.f.3)
120.00cubic yds
Miles of Stream Treated with spawning gravel placement (C.4.f.2)
0.19mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.00mi