Pentland Creek/Smoke Farm Rearing
#02-1606 #02-1606
Organization Stillaguamish River Salmon Recovery Co-Lead Entity
Sponsor Snohomish Conservation District
Status Completed
Schedule Start Date: 7/1/2003 End Date: 8/4/2009
Category Category: Restoration
DESCRIPTION
Snohomish Conservation District used this funding to restore instream and riparian habitat on Pentland Creek and the North Fork Stillaguamish River on the southwest (downstream) lobe of Smoke Farm. Pentland Creek enters the river approximately 5.3 miles upstream from the confluence of the north and south forks of the Stillaguamish. Part of the project occurred on Pentland Creek from its confluence with the North Fork Stillaguamish River upstream approximately 3000 feet to the point where it flows off the valley wall. This section of Pentland Creek had been ditched along the hillside, presumably for the purpose of maximizing agricultural use of the floodplain. Restoration also took place on the North Fork Stillaguamish River on the eastern portion of the lobe. Bank armoring in this area had prevented natural channel avulsion and side-channel formation and maintenance. Restoration activities included: 1. Re-locating Pentland Creek into a more natural, meandering channel on a NRCS Wetland Reserve Program (WRP) easement south of its present location; 2. Reconnecting the creek to its floodplain; 3. Placing large woody material in newly created channel; 4. Establishing a riparian forest along the newly created channel and along the North Fork Stillaguamish River; and, 5. Removing riprap from the banks of the North Fork Stillaguamish River. The project provides rearing habitat for coho, chum, and pink salmon and cutthroat trout, and potential rearing habitat for Chinook. Partners included Snohomish County, the Stillaguamish Clean Water District, and Stillaguamish Tribe. The SRFB previously funded acquisition and restoration on the upstream (NE) lobe of Smoke Farm through Forterra (dba the Cascade Land Conservancy) in project #02-1589C.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
RequestedSnohomish Conservation DistrictMatch$76,100.00
RequestedRecreation and Conservation Office (RCO)Salmon State Projects$105,715.00
Allocated08/04/2009Recreation and Conservation Office (RCO)Salmon Federal Projects$103,691.10
Allocated08/04/2009Snohomish Conservation DistrictMatch$168,994.58
Spent08/04/2009Recreation and Conservation Office (RCO)Salmon Federal Projects-$103,691.10
Spent08/04/2009Snohomish Conservation DistrictMatch-$168,994.58
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$272,686.00 $181,815.00 $272,685.68 $272,685.68 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, North Fork Stillaguamish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Snohomish
HUC12:Brooks Creek-North Fork Stillaguamish River (171100080106)
HUC12:Rock Creek-North Fork Stillaguamish River (171100080109)
HUC8:Stillaguamish (17110008)
Lead Entity Area:Stillaguamish River
Legislative District:39
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:09
Sections:17
Steelhead-Pop (ESU):Steelhead-Puget Sound, Stillaguamish River, Threatened
Township:T32NR06E
Township:T32NR07E
Watershed Administrative Unit:Lower NF Stillaguamish
WRIA:Stillaguamish
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.60mi0.60mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.60mi0.60mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
5.00acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.20mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.60mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.60acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.60mi
Number of structures placed in channel (C.4.d.7)
300.00
Pools Created through channel structure placement (C.4.d.5)
0.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
3.00yd
 Plant removal/control (C.4.g.1)    
Acres of Streambed Treated for plant removal/control (C.4.g.4)
5.00acres
Miles of Stream Treated for plant removal/control (C.4.g.3)
0.60mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.60mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.60acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.60mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
27.00acres