Little Deer Erosion Control
#02-1596 #02-1596
Organization Stillaguamish River Salmon Recovery Co-Lead Entity
Sponsor Snohomish Conservation District
Status Completed
Schedule Start Date: 5/30/2003 End Date: 2/21/2006
Category Category: Restoration
DESCRIPTION
Snohomish Conservation District partnered with the US Forest Service to provide controlled drainage along 13.85 miles of Little Deer Road System to reduce risk of road failure, erosion, and sediment production, and to reduce effects on fish habitat (egg-to-fry survival/rearing survival) and water quality in Little Deer Creek (Deer Creek is listed as temperature sensitive, WA 303d). Little Deer Creek is a major tributary to Deer Creek (an important tributary to the North Fork Stillaguamish River). Bull trout, steelhead and coho utilize Little Deer Creek, while chinook, pink, chum, and sea run cutthroat trout utilize lower Deer Creek. Little Deer Creek has 10 miles of anadromous and resident fish habitat, and has been identified as refugia for steelhead, coho, and char in the Deer Creek basin. This project applied various treatments, including the addition and/or replacement of culverts, fill stabilization, installation of water bars, and removal of road prism where needed for stability. These treatments are expected to improve water quality and reduce the risk of landslides/sediment delivery. This action is expected to contribute to the incremental reduction of road-associated failures and other sedimentation that is occurring from water collection and concentration. Better spawning, egg to fry survival, rearing and holding habitat conditions for salmon and other aquatic species will result. Monitoring has been an ongoing part of this restoration effort.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested12/02/2002Snohomish Conservation DistrictMatch$47,000.00
Requested12/02/2002Recreation and Conservation Office (RCO)Salmon State Projects$262,500.00
Allocated02/21/2006Snohomish Conservation DistrictMatch$47,000.00
Allocated02/21/2006Recreation and Conservation Office (RCO)Salmon Federal Projects$253,109.85
Spent02/21/2006Snohomish Conservation DistrictMatch-$47,000.00
Spent02/21/2006Recreation and Conservation Office (RCO)Salmon Federal Projects-$253,109.85
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$300,110.00 $309,500.00 $300,109.85 $300,109.85 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, North Fork Stillaguamish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Skagit
HUC12:Lower Deer Creek (171100080108)
HUC8:Stillaguamish (17110008)
Lead Entity Area:Stillaguamish River
Legislative District:39
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:17
Sections:26
Steelhead-Pop (ESU):Steelhead-Puget Sound, Deer Creek, Threatened
Township:T34NR07E
Watershed Administrative Unit:Deer Creek
WRIA:Stillaguamish
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Site Stewardship Project    
 Restored land maintained (C.11.c.1)    
Acres of restored land maintained (C.11.c.2)
2.00acres
Upland Habitat And Sediment Project    
Acres of Upland Habitat Area Treated (C.6.b.1)
2.00acres2.00acres
Miles of Road Treated (C.6.b.2)
13.85mi13.85mi
 Road abandonment (C.6.d.1)    
Average width of road abandoned (in whole yards) (C.6.d.3)
0.00yd
Miles of Road Abandoned (C.6.d.2)
0.00mi
 Road drainage system improvements and reconstruction (C.6.c.1)    
Average width of road treated for drainage improvements and reconstruction (C.6.c.3)
10.00yd
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2)
13.85mi