Port Susan Bay Restoration for Resiliency 2022
#22-1063 #22-1063
Organization Stillaguamish River Salmon Recovery Co-Lead Entity
Sponsor The Nature Conservancy (TNC)
Status Active
Schedule Start Date: 7/1/2023 End Date: 12/31/2026
Category Category: Restoration
DESCRIPTION

The Port Susan Bay (PSB) Restoration for Resiliency project will restore key ecological processes to 150 acres of estuarine tidal marsh. Restoration actions will include: distributary and blind tidal channel excavation, creation of additional tidal and river connections, and removal of remnant dike material inhibiting freshwater distribution. By expanding the amount of viable estuary habitat in the delta, the project will increase juvenile salmon rearing capacity for several species, including Chinook salmon. The project has received funding for design and permitting; construction costs are partially funded. This proposal seeks $1,995,249 to move forward with full construction.

TNC will be exploring the use of explosives to carve secondary and tertiary tidal channels beginning with a test blast in Summer 2022. If effective, blasting will be used on a larger scale in the restoration project, paired with traditional methods.

This project is a priority for partners working in the watershed: it will ensure that the value of upstream salmon recovery projects is not lost at the estuary by increasing functional estuarine rearing habitat, needed to avoid a Chinook salmon habitat bottleneck. It is a critical first step for forthcoming delta habitat expansion by the Stillaguamish Tribe of Indians and the Tulalip Tribes directly adjacent. Lastly, it is part of an integrated effort by the Sustainable Lands Strategy (SLS) to advance fish, flood, and farm benefits in the w

Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested01/31/2022Recreation and Conservation Office (RCO)PSAR Large Capital Projects$1,729,060.00
Allocated02/24/2025Recreation and Conservation Office (RCO)Estuary & Salmon Restoration$346,284.00
Allocated02/24/2025Recreation and Conservation Office (RCO)PSAR Large Capital Projects$1,729,000.00
Spent08/21/2024Recreation and Conservation Office (RCO)PSAR Large Capital Projects-$612,832.57
Spent05/01/2025The Nature Conservancy (TNC)Match-$0.00
Spent05/01/2025Recreation and Conservation Office (RCO)Estuary & Salmon Restoration-$18,878.28
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,995,249.00 $1,729,060.00 $2,075,284.00 $631,710.85 $1,443,573.15
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, South Fork Stillaguamish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Snohomish
HUC12:Stillaguamish River-Frontal Port Susan (171100080304)
HUC8:Stillaguamish (17110008)
Lead Entity Area:Stillaguamish River
Legislative District:10
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:01
Steelhead-Pop (ESU):Steelhead-Puget Sound, Stillaguamish River, Threatened
Township:T31NR03E
Watershed Administrative Unit:Lower Stillaguamish River
WRIA:Stillaguamish
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
0.00acres
 Channel modification (C.9.c.1)    
Acres of Estuary Treated (C.9.c.3)
4.00acres
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
0.00acres
Miles Of Dikes Modified/Removed (C.9.d.2)
0.00mi
 Estuarine plant removal / control (C.9.j.1)    
Acres of Estuary Treated for plant removal/control (C.9.j.3)
 Fill placement (C.9.h.1)    
Acres of Estuary Treated with fill placement (C.9.h.2)
9.00acres
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
*Total Riparian Miles Streambank Treated (C.5.b.1)
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
Miles of streambank planted (C.5.c.4)
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
Miles of streambank treated for plant removal/control (C.5.h.4)