Lower Skykomish River Restoration Project
#07-MPR-370 #07-MPR-370
Organization Snohomish Basin Lead Entity
Sponsor Snohomish County
Status Completed
Schedule Start Date: 12/10/2010 End Date: 4/27/2015
Category Category: Restoration
DESCRIPTION
This restoration project improved instream and floodplain habitat along 2 miles of the Skykomish River near Sultan, WA. Overall, the Lower Skykomish River Restoration is a 2.8 mile phased, multi-site, multi-benefit project. With this project, a combination of strategies were applied that work with natural channel processes to promote habitat and water quality improvement, and to help safeguard the productivity of adjoining floodplain areas. Floodplain flood fencing was installed along 6000 lineal feet of river bank adjacent to active agriculture fields. The flood fencing was inter-planted with conifer trees. Two in-channel flood fence arrays and six small modular log jam structures were completed in Groeneveld Slough. Twenty-five (25) large habitat boulder-ballasted logs with rootwads were placed on the bed of an off-channel slough (Bahnmiller site). Six flood fence arrays were installed on the meander bar upstream on the Labish property. A jam structure was placed, consisting of 11 large logs with rootwads, downstream of the instream bar flood fencing. Thirty-six (36) habitat boulder-ballasted rootwad logs were installed along 370 foot of pool habitat overlapped in an open structure formation. Adjacent to the enhanced pool, the simplified bank edge (370 feet) was rehabilitated by reducing the vertical eroding slope to 3:1, adding edge complexity wood structures, bio-engineered fabric and plantings. This project resulted from a reach scale geomorphic analysis (attachment #99027) of the lower Skykomish River below Sultan (RM 0 to RM 13.5) Snohomish County conducted to identify and design specific restoration projects that will be consistent with natural processes.This project included high priority actions identified in the adopted 2005 Snohomish Basin Chinook Recovery Plan, 2010 Lower Skykomish River Restoration Assessment, and the County-facilitated Sustainable Lands Strategy Skykomish River Reach Scale Plan. This project was also identified as a Tier 1, primary focus reach project in the Puget Sound Partnership 3-Year Work Plan. Moving this project from plan to implementation depended on multiple partnerships and serves as a model for the reach scale, multiple benefit approach.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/25/2010Snohomish CountyMatch$51,775.00
Requested08/25/2010Recreation and Conservation Office (RCO)Salmon State Projects$231,725.00
Allocated04/27/2015Snohomish CountyMatch$87,879.64
Allocated04/27/2015Recreation and Conservation Office (RCO)Salmon State Projects$100,000.00
Allocated04/27/2015Recreation and Conservation Office (RCO)Salmon Federal Projects$376,116.69
Spent07/25/2014Recreation and Conservation Office (RCO)Salmon State Projects-$100,000.00
Spent04/27/2015Snohomish CountyMatch-$87,879.64
Spent04/27/2015Recreation and Conservation Office (RCO)Salmon Federal Projects-$376,116.69
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$915,000.00 $283,500.00 $563,996.33 $563,996.33 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Requested12/04/2013Snohomish County Public Utility District No. 1Match$175,000.00
Requested12/02/2015Department of Ecology (ECY)Match$216,000.00
Allocated12/04/2013Snohomish County Public Utility District No. 1Match$175,000.00
Allocated12/02/2015Department of Ecology (ECY)Match$216,000.00
Spent12/04/2013Snohomish County Public Utility District No. 1Match-$175,000.00
Spent12/02/2015Department of Ecology (ECY)Match-$216,000.00
Other Funding Totals Proposed Requested Allocated Spent Balance
$0.00 $391,000.00 $391,000.00 $391,000.00 $0.00
Grand Totals Proposed Requested Allocated Spent Balance
$915,000.00 $674,500.00 $954,996.33 $954,996.33 $0.00
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Skykomish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Snohomish
HUC12:Elwell Creek-Skykomish River (171100090702)
HUC8:Skykomish (17110009)
Lead Entity Area:Snohomish Basin
Legislative District:12
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Pink2-Pop (ESU):Pink-Even Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:12
Snohomish Strategy Group:Mainstem-primary restoration
Snohomish Subbasins:Lower Mainstem Skykomish
Steelhead-Pop (ESU):Steelhead-Puget Sound, Snohomish/Skykomish Rivers, Threatened
Township:T27NR07E
Watershed Administrative Unit:Woods Creek
WRIA:Snohomish
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
1.70mi1.57mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.23mi1.38mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
1.50acres1.50acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.40mi1.38mi
Number of structures placed in channel (C.4.d.7)
8.0016.00
Pools Created through channel structure placement (C.4.d.5)
0.0010.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
25.00yd59.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.07mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
9.10acres25.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
1.23mi1.42mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
9.10acres9.80acres
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
25.00acres