Mustach - Quilceda Cr.
#07-USR-012 #07-USR-012
Organization Snohomish Basin Lead Entity
Sponsor Tulalip Tribes
Status Completed
Schedule Start Date: 4/1/2005 End Date: 9/11/2009
Category Category: Restoration
Project Photo
DESCRIPTION
As one of fourteen Regional Fishery Enhancement Groups (RFEG's) within the State of Washington, the Stilly-Snohomish Fisheries Enhancement Task Force (Task Force) is sponsoring a fish passage barrier correction project on upper mainstem Quilceda Creek near Marysville, WA. Quilceda Creek is a well-documented salmon-bearing stream that drains into Ebey Slough as part of the lower Snohomish River estuary. The Task Force will work with a qualified private forest landowner under the Family Forest Fish Passage Program to remove an existing corrugated metal squash pipe that is a partial barrier to chum, coho, steelhead, and cutthroat migration. The existing barrier culvert will be replaced with a 50' long x 16' wide pre-cast concrete bridge structure to provide unimpeded access upstream to nearly 2.5 miles of high quality complex forested wetland/stream spawning and rearing habitat.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/11/2007Recreation and Conservation Office (RCO)FFFPP Grants$29,000.00
Requested04/11/2007Tulalip TribesMatch$50,000.00
Allocated08/14/2009Recreation and Conservation Office (RCO)FFFPP Grants$67,340.61
Spent08/14/2009Tulalip TribesMatch-$0.00
Spent08/14/2009Recreation and Conservation Office (RCO)FFFPP Grants-$67,340.61
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$130,000.00 $79,000.00 $67,340.61 $67,340.61 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Skykomish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Sisco Heights
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Snohomish
HUC12:Quilceda Creek (171100110204)
HUC8:Snohomish (17110011)
Lead Entity Area:Snohomish Basin
Legislative District:39
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Pink2-Pop (ESU):Pink-Even Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:02
Snohomish Strategy Group:Urban stream restoration
Snohomish Subbasins:Quilceda Creek
Steelhead-Pop (ESU):Steelhead-Puget Sound, Snohomish/Skykomish Rivers, Threatened
Township:T30NR05E
Watershed Administrative Unit:Quilceda Creek
WRIA:Snohomish
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.01mi0.01mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
2.29mi2.29mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
2.29mi
Number of bridges (C.2.g.2)
1.00
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
2.29mi
Number of culverts (C.2.f.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Fishway chutes or pools installed (C.2.d.1)    
Number Of Fishway Chutes/Pools Installed (C.2.d.2)
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.00mi
Number of road-crossings (C.2.i.2)
1.00