Stillwater Flooodplain Restoration - Construction
#07-MPR-302 #07-MPR-302
 Mainstem - Primary Restoration Sub-Basin Strategy Group Conceptual Stillwater Flooodplain Restoration - Construction
Organization Snohomish Basin Lead Entity
Sponsor Wild Fish Conservancy
Status Completed
Schedule Start Date: 10/7/2010 End Date: 4/4/2014
Category Category: Restoration
Project Photo
DESCRIPTION
This project will result in the restoration of at minimum 1000 feet of shoreline in the Stillwater reach of the Snoqualmie River. Project actions include the removal of bank armament, the reconstruction of shoreline edge habitat with LWD installations and plantings, and potentially the construction of 1 engineered log jam. Currently the Wild Fish Conservancy is in the process of completing a feasibility study for this restoration project. Initial results from this study show that the restoration would have little impact on downstream landowners. The aspects of the feasibility study that still need to be completed will determine whether or not we will construct an ELJ on the Carnation Farms property as a part of the restoration project. We are working with current landowners, including WDFW and Camp Korey to obtain full landowner permission for this project, both parties, along with King County have been extensively involved with project planning and public outreach efforts. It is expected that construction will occur during the summer of 2013.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/25/2010Wild Fish ConservancyMatch$204,814.00
Requested08/25/2010Recreation and Conservation Office (RCO)Salmon State Projects$481,000.00
Allocated04/03/2014Wild Fish ConservancyMatch$117,372.61
Allocated04/03/2014Recreation and Conservation Office (RCO)Salmon Federal Projects$237,848.44
Allocated04/03/2014Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$305,348.00
Spent10/30/2013Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$305,348.00
Spent04/03/2014Recreation and Conservation Office (RCO)Salmon State Projects-$0.00
Spent04/03/2014Wild Fish ConservancyMatch-$117,372.61
Spent04/03/2014Recreation and Conservation Office (RCO)Salmon Federal Projects-$237,848.44
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$660,569.00 $685,814.00 $660,569.05 $660,569.05 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Snoqualmie River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:King
HUC12:Harris Creek-Snoqualmie River (171100100601)
HUC8:Snoqualmie (17110010)
Lead Entity Area:Snohomish Basin
Legislative District:45
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Pink2-Pop (ESU):Pink-Even Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:09
Snohomish Strategy Group:Mainstem-primary restoration
Snohomish Subbasins:Mid-Mainstem Snoqualmie
Steelhead-Pop (ESU):Steelhead-Puget Sound, Snoqualmie River, Threatened
Township:T25NR07E
Watershed Administrative Unit:Harris Creek
WRIA:Snohomish
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.20mi0.40mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.40mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.20acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.40mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.40mi
Number of structures placed in channel (C.4.d.7)
35.00
Pools Created through channel structure placement (C.4.d.5)
0.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
30.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
2.50acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.40mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.50acres