Riverton Creek Flapgate Removal II
#09-DUW-008 #09-DUW-008
Organization Green/Duwamish and Central Puget Sound Watershed (WRIA 9) Lead Entity
Sponsor City of Tukwila
Status Completed
Schedule Start Date: 1/19/2018 End Date: 7/11/2022
Category Category: Restoration
DESCRIPTION
Improve habitat conditions along the lower 1300 lineal feet of Riverton Creek and restore fish access between the creek and the Duwamish River, providing off-channel rearing habitat for salmonids, including the ESA listed Chinook salmon, steelhead, and bull trout.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested03/30/2017City of TukwilaMatch$52,217.00
Requested03/30/2017Recreation and Conservation Office (RCO)Salmon State Projects$295,895.00
Allocated02/25/2021Recreation and Conservation Office (RCO)Salmon Federal Projects$295,895.00
Allocated02/25/2021City of TukwilaMatch$333,500.00
Allocated02/25/2021Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$651,070.00
Spent07/11/2022Recreation and Conservation Office (RCO)Salmon Federal Projects-$295,895.00
Spent07/11/2022City of TukwilaMatch-$333,500.00
Spent07/11/2022Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$651,070.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,600,000.00 $348,112.00 $1,280,465.00 $1,280,465.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Green River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Tukwila
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:King
HUC12:Green River (171100130305)
HUC8:Duwamish (17110013)
Lead Entity Area:Green/Duwamish/Central Puget Sound Watershed (WRIA 9)
Legislative District:11
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:09
Steelhead-Pop (ESU):Steelhead-Puget Sound, Green River, Threatened
Township:T23NR04E
Watershed Administrative Unit:Lower Green-Duwamish
WRIA:Duwamish - Green
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.30mi0.74mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
0.70acres0.70acres
 Removal of existing fill material (C.9.g.1)    
Acres of Estuary Treated through fill material removal (C.9.g.2)
0.10acres0.10acres
 Tidegate alteration / removal (C.9.e.1)    
Acres opened To Fish Passage through tidegate alteration/removal (C.9.e.3)
0.40acres0.70acres
Miles of stream made accessible by removal or modification of tidegate
Number of Tidegates Altered/Removed To Allow Fish Passage (C.9.e.2)
2.002.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.10mi0.11mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.11mi0.11mi
Number of structures placed in channel (C.4.d.7)
15.0014.00
Pools Created through channel structure placement (C.4.d.5)
6.0011.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
2.20acres2.20acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.30mi0.74mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.20acres2.20acres
Miles of streambank planted (C.5.c.4)
0.30mi0.74mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
2.20acres2.20acres
Miles of streambank treated for plant removal/control (C.5.h.4)
0.30mi0.57mi
NOTES
NOAA/NMFS offer grants to removed barrers including tidegates. Applications were due 10/31/2008 for the 2009 grant round with actual funds of $7,000,000. No match was required but is recommended. See project file for 2009 announcement.



10/2011:  project still needs funding.  No work to date, only feasibility assessment and design conducted.