DESCRIPTION
The goal of this project is to reconnect the floodplain area of the Green River allowing natural processes to be re-established including the creation of side channel habitat.
The goal of this project is to reconnect the floodplain area of the Green River allowing natural processes to be re-established includeing the creation of side channel habitat. This project would allow the river to re-establish access to over 1,300 feet of additional river edge and allow it to create additional side channel and main channel habitat at RM 37, right bank. The project would add native vegetation and place large woody debris.
The project requires the construction of setback levees to protect the existing farmland and hardpoints to protect properties behind the site from erosion.