Fenster Levee Setback Phase 1
#09-MG-018 #09-MG-018
Organization Green/Duwamish and Central Puget Sound Watershed (WRIA 9) Lead Entity
Sponsor City of Auburn
Status Completed
Schedule Start Date: 2/28/2006 End Date: 4/17/2009
Category Category: Restoration
DESCRIPTION
The City of Auburn contracted with King County Water and Land Resources to remove approximately 700 linear feet of the old Fenster Levee along the Green River. The completed work included: removal of the rock armor from the existing levee, removal of invasive plant species, dike removal and setback for the new levee location, installation of large woody debris (60+ logs with rootwads; these were buried and anchored in place) along the toe of the riverbank, excavation of off-channel habitat, re-establishment of flood plain connectivity, removal of excavated soil, building a large mound at the southwest corner of the site, and preparing the site for revegetation. Rehabilitation of the old side channel now provides an additional passageway for juvenile salmonids to access flood refugia and overwintering habitat in several acres of high quality, densely forested off-channel Pautzke Slough, just upstream.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/30/2005City of AuburnMatch$135,500.00
Requested09/30/2005Recreation and Conservation Office (RCO)Salmon State Projects$675,900.00
Allocated01/06/2006City of AuburnMatch$135,500.00
Allocated01/06/2006Recreation and Conservation Office (RCO)Salmon Federal Projects$675,900.00
Spent02/20/2009City of AuburnMatch-$135,500.00
Spent02/20/2009Recreation and Conservation Office (RCO)Salmon Federal Projects-$675,900.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$811,400.00 $811,400.00 $811,400.00 $811,400.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Green River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Auburn
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:King
HUC12:Mill Creek-Green River (171100130304)
HUC8:Duwamish (17110013)
Lead Entity Area:Green/Duwamish/Central Puget Sound Watershed (WRIA 9)
Legislative District:31
Legislative District:47
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:17
Steelhead-Pop (ESU):Steelhead-Puget Sound, Green River, Threatened
Township:T21NR05E
Watershed Administrative Unit:Lower Green-Duwamish
WRIA:Duwamish - Green
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.40mi0.40mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.45mi0.40mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
1.00acres
Instream Pools Created/Added (C.4.c.6)
5.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.12mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.40mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
2.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.40mi
Number of structures placed in channel (C.4.d.7)
60.00
Pools Created through channel structure placement (C.4.d.5)
5.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
15.00yd
 Plant removal/control (C.4.g.1)    
Acres of Streambed Treated for plant removal/control (C.4.g.4)
2.00acres
Miles of Stream Treated for plant removal/control (C.4.g.3)
0.40mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.20mi0.15mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
9.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.40mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
9.00acres