Lower Rutledge Johnson Floodplain Restoration Fina
#CR-13.4-13.6-LB #CR-13.4-13.6-LB
Organization Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
Sponsor King County Water & Land Resources
Status Active
Schedule Start Date: 9/14/2023 End Date: 7/31/2026
Category Category: Planning & Restoration
DESCRIPTION
King County Water and Land Resources Division (WLRD) will prepare final design documents and implement a floodplain reconnection and salmon habitat restoration project on the left bank lower Cedar River near the Mouth of Taylor Creek reach (RM 13.1-13.5). The future restoration project will reconnect up to 16 acres of the Cedar River floodplain and remove up to 600 feet of the Rutledge Johnson levee, with the goal of restoring riverine processes that benefit Chinook, coho, and steelhead trout. Final design products will include secured permits, public outreach, stakeholder coordination, design reports, and a construction bid package that contains plans, specifications, and cost estimate based on appropriate engineering and environmental analyses. Funding will also be applied to implementation of the project. This project was awarded 2020 funding from PSAR and WRIA 8 Cooperative Watershed Management grants for Conceptual Design (CWM) and awarded partial final design funding from CWM in 2022. The project is on track to complete construction in 2024. The project will improve in-stream and off-channel salmon habitat and function by increasing channel complexity, creating more diverse flow conditions, and facilitating more direct connections to floodplain habitats. Under existing conditions, juvenile salmonid habitat is largely confined to the mainstem river through the project area, which severely limits rearing and refuge for Chinook and other species. 
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested02/24/2023King County Water & Land ResourcesMatch$40,000.00
Requested02/24/2023Recreation and Conservation Office (RCO)Salmon State Projects$220,000.00
Allocated09/14/2023King County Water & Land ResourcesMatch$40,000.00
Allocated09/14/2023Recreation and Conservation Office (RCO)Salmon State Projects$100,520.00
Spent09/05/2024King County Water & Land ResourcesMatch-$36,000.00
Spent09/05/2024Recreation and Conservation Office (RCO)Salmon State Projects-$90,468.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
Not entered $260,000.00 $140,520.00 $126,468.00 $14,052.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Allocated05/23/2024King County Flood Control DistrictCooperative Watershed Management FundingMatch$2,012,110.00
Other Funding Totals Proposed Requested Allocated Spent Balance
$0.00 $0.00 $2,012,110.00 $0.00 $2,012,110.00
Grand Totals Proposed Requested Allocated Spent Balance
Not entered $260,000.00 $2,152,630.00 $126,468.00 $2,026,162.00
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Cedar River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Hobart
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:King
HUC12:Madsen Creek-Cedar River (171100120107)
HUC8:Lake Washington (17110012)
Lead Entity Area:Lake Washington/Cedar/Sammamish Watershed (WRIA 8)
Legislative District:05
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:04
Steelhead-Pop (ESU):Steelhead-Puget Sound, Cedar River, Threatened
Township:T22NR06E
Watershed Administrative Unit:Lower Cedar River
WRIA:Cedar - Sammamish
View project on a larger map

Related Projects

  APPLICATION FINAL 
PLANNING/RESTORATION METRICS
Area Encompassed (acres) (B.0.b.1)
16.00acres
Miles of Stream and/or Shoreline Affected (B.0.b.2)
0.60mi
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.60mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.60mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
16.00acres
Instream Pools Created/Added (C.4.c.6)
1.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.20mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.20mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.20mi
Number of structures placed in channel (C.4.d.7)
4.00
Pools Created through channel structure placement (C.4.d.5)
1.00