35th Avenue NE Culvert L-80 Replacement Project
#20-1666 #20-1666
Organization Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
Sponsor City of Lake Forest Park
Status Alternate
Schedule Start Date: 6/7/2022 End Date: 6/7/2023
Category Category: Restoration
DESCRIPTION
The City of Lake Forest Park proposes to replace the culvert (L-80) conveying Lyon Creek beneath 35th Avenue NE, which is approximately 198 stream meters (m) south of its crossing of Ballinger Way NE. The existing 47-foot-long structural plate steel (SPS) arch culvert is undersized for conveyance of peak flows and debris, and is identified as a partial barrier to fish passage due to slope and velocity according to 2017 and 2010 WDFW Level A culvert assessments.The City proposes to replace the existing L-80 culvert to improve fish passage with a 22-foot span by 8-foot rise by 65-foot long four-sided concrete box culvert and natural stream channel. The replacement culvert will meet WDFW Stream Simulation Culvert Design Criteria for channel width, culvert bed slope, stream bed material gradation, depth of stream bed materials, and capacity to convey the 100-year design flow and debris. The culvert and associated stream bed sediment will be installed with a 1.0% slope. Average 2-year flood slope upstream is 0.9% over a channel distance of 63 m.; the replacements slope of 1.0%  will meet WDFW slope ratio criteria. Large woody debris and root wads will be installed to provide aquatic habitat.Fish species benefited by this project include Chinook, coho, steelhead, searun cutthroat, and resident trout.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested05/29/2020City of Lake Forest ParkMatch$242,209.00
Requested05/29/2020Recreation and Conservation Office (RCO)BA Fish Barrier Removal Board$1,372,515.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1.00 $1,614,724.00 $0.00 $0.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Lake Forest Park
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:King
HUC12:Lake Washington-Sammamish River (171100120400)
HUC8:Lake Washington (17110012)
Lead Entity Area:Lake Washington/Cedar/Sammamish Watershed (WRIA 8)
Legislative District:01
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:10
Steelhead-Pop (ESU):Steelhead-Puget Sound, North Lake Washington and Lake Sammamish, Threatened
Township:T26NR04E
Watershed Administrative Unit:N Lake Washington
WRIA:Cedar - Sammamish
View project on a larger map