Organization | Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity |
Sponsor | King County |
Status | Planned |
Schedule |
Category | Category: Restoration |
Description
Enhance the side channel on public land near 218th Place SE. Consider whether a connection at the upstream end or whether enhancements to the existing backwater condition will provide the most benefit.
Opportunities, Constraints, and other Considerations
Connection at upstream end would require modification or removal of Rutledge-Johnson levee. Aligns with Cedar Corridor Plan Habitat Opportunity Areas #15 and 16.