Coal Mine Creek Fish Passage Project
#00-1835 #00-1835
 WRIA 10 Coal Mine Creek Coal Mine Creek Fish Passage Project
Organization Puyallup and Chambers Watershed Salmon Recovery Lead Entity
Sponsor Pierce Conservation District
Status Completed
Schedule Start Date: 2/1/2001 End Date: 11/15/2001
Category Category: Restoration
Project Photo
DESCRIPTION
This project provided unimpeded fish passage to the headwaters of Coal Mine Creek (WRIA 10.042A). This project removed two passage barriers and replaced them with structures that allow passage for salmonids at all life stages. Approximately 350 linear meters of habitat were made accessible by this project, including 202 square meters of spawning habitat and 1083 square meters of rearing habitat (PCD habitat assessment survey, 2000), providing immediate and long term benefits to salmon. Stable spring fed flows and a network of wetlands above the barriers provide critical rearing habitat for all species. Coal Mine Creek is one of WDFW's index streams for Coho spawning escapement in the Puyallup River Basin. This right bank tributary is part of the Wilkeson Creek drainage, which is regarded as one of the most productive creeks in the basin. The WDFW Priority Index Number for this site is 13. Habitat made accessible by this project is suitable for wild Chinook and coho salmon, steelhead, and sea-run/resident cutthroat. Re-establishing fish passage has other benefits, including transportation marine nutrients upstream i.e. salmon carcasses. Construction of a properly sized structure enhanced downstream migration of stream bed-load, increasing diversity of substrate size and quality of downstream spawning habitat. Finally, woody debris is more able to migrate downstream to provide cover for fish and enhance channel diversity.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested11/15/2000Pierce Conservation DistrictMatch$16,920.00
Requested11/15/2000Recreation and Conservation Office (RCO)Salmon State Projects$67,680.00
Allocated01/26/2001Pierce Conservation DistrictMatch$16,920.00
Allocated01/26/2001Recreation and Conservation Office (RCO)Salmon State Projects$67,680.00
Spent11/15/2001Pierce Conservation DistrictMatch-$16,920.00
Spent11/15/2001Recreation and Conservation Office (RCO)Salmon State Projects-$67,680.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$106,227.95 $84,600.00 $84,600.00 $84,600.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Puyallup River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
HUC12:Wilkeson Creek (171100140103)
HUC8:Puyallup (17110014)
Lead Entity Area:Pierce County
Legislative District:31
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:28
Steelhead-Pop (ESU):Steelhead-Puget Sound, Puyallup River/Carbon River, Threatened
Township:T19NR06E
Watershed Administrative Unit:Wilkeson
WRIA:Puyallup - White
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.17mi0.17mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.75mi0.75mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.75mi0.75mi
Number of culverts (C.2.f.2)
2.00
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.17mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.00acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.17mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.10acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.17mi
Number of structures placed in channel (C.4.d.7)
10.00
Pools Created through channel structure placement (C.4.d.5)
0.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)