Flett Creek Dam Removal Project
#00-1082 #00-1082
 WRIA 12 Flett Creek Flett Creek Dam Removal Project
Organization Puyallup and Chambers Watershed Salmon Recovery Lead Entity
Sponsor Pierce Conservation District
Status Completed
Schedule Start Date: 3/17/2000 End Date: 10/10/2000
Category Category: Restoration
Project Photo
DESCRIPTION
Pierce County Conservation District used this funding to remove a dam and an adjacent dilapidated fish ladder structure on Flett Creek, a tributary to Chamber Creek (WRIA 12) in the city of Lakewood. The stream had down-cut below the dam, rendering the existing fish passage structure impassable to salmon. The fish ladder had also undermined and become unstable. The project removed the dam and fish ladder, then re-graded the stream back to its original slope. This project eliminated the last fish passage barrier in the Flett Creek drainage, insuring unimpeded access for chum salmon, coho salmon, and cutthroat inhabiting the stream. There is approximately 2 miles of habitat above the dam. Project partners included the City of Lakewood (providing a 20% funding match), South Puget Sound Salmon Enhancement Group, and Puyallup Tribe.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested02/01/2000Pierce Conservation DistrictMatch$18,960.00
Requested02/01/2000Recreation and Conservation Office (RCO)Salmon State Projects$48,340.00
Allocated10/10/2000Pierce Conservation DistrictMatch$21,905.37
Allocated10/10/2000Recreation and Conservation Office (RCO)Salmon State Projects$48,340.00
Spent10/10/2000Pierce Conservation DistrictMatch-$21,905.37
Spent10/10/2000Recreation and Conservation Office (RCO)Salmon State Projects-$48,340.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$70,245.37 $67,300.00 $70,245.37 $70,245.37 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Lakewood
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
HUC12:Chambers Creek (171100190303)
HUC8:Puget Sound (17110019)
Lead Entity Area:Pierce County
Legislative District:28
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:26
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T20NR02E
Watershed Administrative Unit:Chambers-Clover
WRIA:Chambers - Clover
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.15mi0.15mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
2.00mi2.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.01sq mi
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.00mi0.00mi
Number of culverts (C.2.f.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
0.00cfs
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Fishway chutes or pools installed (C.2.d.1)    
Number Of Fishway Chutes/Pools Installed (C.2.d.2)
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
2.00mi2.00mi
Number of road-crossings (C.2.i.2)
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
Instream Pools Created/Added (C.4.c.6)
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
Miles of Stream Treated for channel structure placement (C.4.d.3)
Number of structures placed in channel (C.4.d.7)
Pools Created through channel structure placement (C.4.d.5)
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
ADDITIONAL INFORMATION