Wilcox Reach - Small Lots Acquisition
#11-MAINSTEM-1044 #11-MAINSTEM-1044
Organization Nisqually River Salmon Recovery Lead Entity
Sponsor Nisqually Land Trust
Status Completed
Schedule Start Date: 1/19/2018 End Date: 4/20/2021
Category Category: Acquisition
DESCRIPTION
The Nisqually Land Trust proposes to acquire for permanent protection up to four properties along the south shoreline of the Wilcox Reach of the Nisqually River in Thurston County, east of Yelm. Both the Nisqually Chinook Salmon Recovery Plan and the Nisqually Steelhead Trout Recovery Plan rate this reach of the Nisqually River as highest priority for protection of habitat for Chinook salmon and steelhead trout, which are federally listed as threatened species. These properties occupy the channel migration zone, and include 0.4 miles of river front. The river is rapidly eroding the shoreline of these properties. Of the 34 acres included in the original parcel boundaries, approximately 14 acres are currently within the active channel area and 20 acres are on the adjacent floodplain. In early 2016, a shift in channel location between river mile 28.8 and 30.8 eroded over 60 feet of bank in front of structures on these properties, leaving one home uninhabitable and a nearby residence at risk. The project would also include demolition of structures and cleanup of the properties, where needed, to enhance natural floodplain and riverine processes. Eliminating structures and infrastructure from these properties will ensure that residential materials and debris do not fall into the river, and minimizing threats to water quality and aquatic habitats.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/11/2016Nisqually Land TrustMatch$50,000.00
Requested08/11/2016Recreation and Conservation Office (RCO)Salmon State Projects$272,394.00
Allocated04/20/2021Nisqually Land TrustMatch$49,948.23
Allocated04/20/2021Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$272,111.98
Spent04/20/2021Nisqually Land TrustMatch-$49,948.23
Spent04/20/2021Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$272,111.98
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$322,394.00 $322,394.00 $322,060.21 $322,060.21 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Nisqually River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
County:Thurston
HUC12:Powell Creek-Nisqually River (171100150205)
HUC8:Nisqually (17110015)
Lead Entity Area:Nisqually
Legislative District:02
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:19
Steelhead-Pop (ESU):Steelhead-Puget Sound, Nisqually River, Threatened
Township:T16NR03E
Watershed Administrative Unit:Powell Creek
Watershed Administrative Unit:Yelm Creek
WRIA:Nisqually
View project on a larger map
  APPLICATION FINAL 
ACQUISTION METRICS
Incidentals    
 Noxious weed control    
Acres treated for noxious weeds by method
Chemical
2.00
Mechanical
8.00
Total
10.00
acres
Biological
0.00
Chemical
2.00
Mechanical
7.00
Total
9.00
acres
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition
0.40mi0.58mi
 Land    
Acres by Acreage Type (fee simple)
Lake
0.00
Riparian
20.30
Tidelands
0.00
Uplands
0.00
Wetlands
0.00
Total
20.30
acres
Riparian
30.02
Uplands
6.49
Total
36.51
acres
 
WORKSITE METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.40mi0.90mi