Mashel Eatonville Restoration Project Phase 2
#11-MASHEL-1005 #11-MASHEL-1005
Organization Nisqually River Salmon Recovery Lead Entity
Sponsor Nisqually Indian Tribe
Status Completed
Schedule Start Date: 7/1/2009 End Date: 5/25/2012
Category Category: Acquisition & Restoration
Project Photo
DESCRIPTION
The Nisqually Indian Tribe requested funds to implement the 2nd phase of a restoration project that is based on thorough planning including the completion of several watershed and restoration assessments and on a very successful first phase. The main objective of this phase was to install engineered log jams to restore and improve 2000ft of in-stream habitat and protect an eroding banks but also to restore the riparian buffers in 6 acres and acquire up to 5 acres of healthy riparian and floodplain forests. A total of 21 log jams were installed by this effort. In combination with adjacent work happening simultaneously by the WA Dept. of Transportation (9 jams) and the Phase 1 project (13 jams) that also occurred within the same reach in 2006 and 2007, the project will total over 43 structures by 2012 to increase pool habitat, increase stable and high quality spawning habitat, increase floodplain connections and decrease bank erosion and mass wasting. The acquisition part of this project also added to on-going efforts to protect streamside habitat in the Eatonville area of the Mashel River which has protected over 100 acres of healthy habitat since 2005. The riparian acquisition totalled 6.5 acres of riparian buffer. These actions were identified as one of the three highest priority restoration activities in the Nisqually watershed chapter of the NOAA approved Puget Sound Chinook Recovery Plan. In the long term this project will contribute to a more sustainable, healthy runs of ESA listed Chinook salmon and Steelhead Trout and the locally depressed pink salmon.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/21/2009Nisqually Indian TribeMatch$216,829.00
Requested04/21/2009Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$1,165,573.00
Allocated05/24/2012Nisqually Indian TribeMatch$216,654.49
Allocated05/24/2012Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$1,164,634.89
Spent04/17/2012Nisqually Indian TribeMatch-$216,654.49
Spent04/17/2012Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$1,164,634.89
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,381,289.00 $1,382,402.00 $1,381,289.38 $1,381,289.38 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Nisqually River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Eatonville
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
HUC12:Mashel River (171100150202)
HUC8:Nisqually (17110015)
Lead Entity Area:Nisqually
Legislative District:02
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:23
Steelhead-Pop (ESU):Steelhead-Puget Sound, Nisqually River, Threatened
Township:T16NR04E
Watershed Administrative Unit:Mashel
WRIA:Nisqually
View project on a larger map

Related Projects

  APPLICATION FINAL 
ACQUISTION METRICS
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition
0.28mi0.00mi
 Land    
Acres by Acreage Type (fee simple)
Riparian
5.00
Total
5.00
acres
Riparian
7.10
Total
7.10
acres
 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.44mi0.60mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.50mi0.50mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
3.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.50mi
Number of structures placed in channel (C.4.d.7)
21.00
Pools Created through channel structure placement (C.4.d.5)
14.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.12mi0.12mi
Real Property Acquisition    
 Acquisition or lease of land, wetland or estuarine for conservation (C.10.c.1)    
Acres Of Land, Wetland Or Estuarine Area Conserved By Acquisition Or Lease (C.10.c.6)
Miles Of Streambank Protected By Land or Easement Acquisition (C.10.c.5)
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
5.30acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.50mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
5.30acres
ADDITIONAL INFORMATION