Coburg Tree Farm - Kronis Creek - R3
#11-MASHEL-2005 #11-MASHEL-2005
Organization Nisqually River Salmon Recovery Lead Entity
Sponsor South Puget Sound Salmon Enhancement Group (SPSSEG)
Status Completed
Schedule Start Date: 11/1/2007 End Date: 3/3/2009
Category Category: Restoration
DESCRIPTION
The Coburg Tree Farm project proposes to replace a 33% passable culvert on Kronis Creek with a 12'2" span x 3'8" rise x 30' long corrugated steel box culvert, set on concrete strip footings. The larger structure with a roughened channl inside will provide unimpeded fish passage for all life stages and improve woody debris passage. The project will also place channel stabilization structures downstream of the road crossing for grade control. Kronis Creek is a tributary to the Little Mashel River in WRIA 11, Nisqually watershed. The project will open 0.62 miles of stream habitat for resident cutthroat trout. Cutthroat trout were observed in trap pools above and below culvert. A natural barrier downstream on the Little Mashel River precludes anadromous access.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested02/21/2008Recreation and Conservation Office (RCO)FFFPP Grants$40,000.00
Allocated03/03/2009Recreation and Conservation Office (RCO)FFFPP Grants$45,531.51
Spent03/03/2009South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$0.00
Spent03/03/2009Recreation and Conservation Office (RCO)FFFPP Grants-$45,531.51
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$46,010.00 $40,000.00 $45,531.51 $45,531.51 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Nisqually River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
HUC12:Little Mashel River (171100150201)
HUC8:Nisqually (17110015)
Lead Entity Area:Nisqually
Legislative District:02
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:29
Steelhead-Pop (ESU):Steelhead-Puget Sound, Nisqually River, Threatened
Township:T16NR05E
Watershed Administrative Unit:Mashel
WRIA:Nisqually
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.62mi0.62mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
Number of bridges (C.2.g.2)
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.62mi0.62mi
Number of culverts (C.2.f.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Fishway chutes or pools installed (C.2.d.1)    
Number Of Fishway Chutes/Pools Installed (C.2.d.2)
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.00mi
Number of road-crossings (C.2.i.2)