Beaver Creek Estuary Restoration - 2005
#05-1437 #05-1437
 South Kitsap Projects Point Glover to Southworth Beaver Creek Estuary Restoration - 2005
Organization West Sound Partners for Ecosystem Recovery
Sponsor Mid-Puget Sound Fisheries Enhancement Group
Status Completed
Schedule Start Date: 1/6/2006 End Date: 6/14/2007
Category Category: Restoration
Project Photo
DESCRIPTION
The Mid-Puget Sound Fisheries Enhancement Group used this grant to increase the Beaver Creek estuary by 4.5 acres and the habitat along the creek by 1,200 feet of shoreline, both of which are vital resources for the area's threatened and endangered salmon. This project continued a stream restoration project on the lower reaches of Beaver Creek, near Manchester. Work included upgrading a culvert, removing the outlet fish ladder, reconstructing the greater estuarine habitat, and reestablishing a saltwater wedge into the upper estuary. The project area is on U.S. Navy property at the Manchester Fuel Depot. In 2003, work on an extensive fish passage and habitat enhancement project for Beaver Creek as it runs through the fuel depot was completed. In 2004, construction began to provide natural stream meanders for the lower reaches of the creek. This was the third phase that extended the restoration work to the estuary at Clam Bay. The Mid-Puget Sound Fisheries Enhancement Group partnered with the U.S. Navy and the Suquamish Tribe. The fisheries group contributed $208,950 in donated materials and volunteer labor.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/26/2005Mid-Puget Sound Fisheries Enhancement GroupMatch$208,950.00
Requested07/26/2005Recreation and Conservation Office (RCO)Salmon State Projects$485,050.00
Allocated01/06/2006Mid-Puget Sound Fisheries Enhancement GroupMatch$208,950.00
Allocated01/06/2006Recreation and Conservation Office (RCO)Salmon State Projects$485,050.00
Spent06/14/2007Mid-Puget Sound Fisheries Enhancement GroupMatch-$208,950.00
Spent06/14/2007Recreation and Conservation Office (RCO)Salmon State Projects-$485,050.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$700,000.00 $694,000.00 $694,000.00 $694,000.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
SECONDARY SPONSOR
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Manchester
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Kitsap
HUC12:Curley Creek-Frontal Colvos Passage (171100190703)
HUC12:Port Orchard Sound (171100191000)
HUC8:Puget Sound (17110019)
Lead Entity Area:West Sound
Legislative District:26
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:North Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:16
Steelhead-Pop (ESU):Steelhead-Puget Sound, East Kitsap Peninsula Tributaries, Threatened
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T24NR02E
Watershed Administrative Unit:Clovos Passage/Carr Inlet
WRIA:Kitsap
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.25mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
4.30acres3.32acres
 Creation of new estuarine area (C.9.q.1)    
Acres of Estuary Created (C.9.q.2)
2.30acres1.47acres
 Estuarine plant removal / control (C.9.j.1)    
Acres of Estuary Treated for plant removal/control (C.9.j.3)
4.30acres3.32acres
 Regrading of slope (C.9.i.1)    
Acres of Estuary Treated through slope regrading (C.9.i.2)
3.30acres
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.25mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.10sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.25mi
Number of bridges (C.2.g.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.25mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.20acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.25mi
Number of structures placed in channel (C.4.d.7)
6.00
Pools Created through channel structure placement (C.4.d.5)
6.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
3.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
1.50acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.25mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.50acres
ADDITIONAL INFORMATION