Penrose Point Bulkhead Removal- Construction
#11-1459 #11-1459
Organization West Sound Partners for Ecosystem Recovery
Sponsor South Puget Sound Salmon Enhancement Group (SPSSEG)
Status Completed
Schedule Start Date: 12/8/2011 End Date: 6/19/2014
Category Category: Restoration
Project Photo
DESCRIPTION
This project utilized final designs and permits previously developed under contract #10-1875 to completely remove a creosote bulkhead, rip rap armor, and fill along a bluff backed beach in Penrose Point State Park. The bulkhead was positioned in a divergence zone at the head of a long, natural low tide spit, at the upstream end of drift cell which is approximately ½ mile long. Removal of the bulkhead reconnected bluff and riparian processes to the nearshore ecosystem, restored sediment transport processes, improved the beach profile for rearing and foraging salmonids, specifically fry migrant Chinook, coho, chum and pink salmon, and enhanced forage fish spawning habitat. The project reach, within Penrose Point State Park, on Case Inlet in South Puget Sound, exhibits all of the key nearshore habitat types. However, habitat and habitat forming processes in the park were impaired by the 700-foot long creosote bulkhead with rip rap toe protection. In February 2013 this bulkhead, rip rap and fill were removed. Wood was placed along the shoreline and the restored area was replanted with native grasses, forbes, sedges, trees, and shrubs. Two interpretive signs were installed near the park entrance and at the restoration site in April 2014.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/02/2011South Puget Sound Salmon Enhancement Group (SPSSEG)Match$57,900.00
Requested08/02/2011Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$328,100.00
Allocated06/19/2014Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$33,445.00
Allocated06/19/2014South Puget Sound Salmon Enhancement Group (SPSSEG)Match$60,777.43
Allocated06/19/2014Recreation and Conservation Office (RCO)Salmon Federal Projects$310,135.55
Spent05/06/2013Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$33,445.00
Spent06/19/2014South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$60,777.43
Spent06/19/2014Recreation and Conservation Office (RCO)Salmon Federal Projects-$310,135.55
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$386,000.00 $386,000.00 $404,357.98 $404,357.98 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Home
City Areas:Longbranch
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
HUC12:South Puget Sound (171100190900)
HUC8:Puget Sound (17110019)
Lead Entity Area:West Sound
Legislative District:26
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Watershed Administrative Unit:Key Peninsula
WRIA:Kitsap
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
0.25acres0.30acres
 Beach nourishment (C.9.l.1)    
Acres Treated for beach nourishment (C.9.l.4)
0.20acres0.20acres
Cubic Yards Of Beach Substrate Placed (C.9.l.2)
3,000.00cubic yds1,500.00cubic yds
Miles of Shoreline Treated for beach nourishment (C.9.l.3)
0.14mi0.30mi
 Contaminant removal / remediation (C.9.m.1)    
Acres Treated for contaminant removal/modification (C.9.m.2)
0.30acres0.30acres
 Removal of existing fill material (C.9.g.1)    
Acres of Estuary Treated through fill material removal (C.9.g.2)
0.30acres0.30acres
 Shoreline armor removal or modification (C.9.k.1)    
Acres of Shoreline Treated for armor modification/removal (C.9.k.3)
0.20acres0.20acres
Miles of Shoreline Treated for armor modification/removal (C.9.k.2)
0.14mi0.30mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.20acres0.20acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.14mi0.14mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.20acres0.20acres
ADDITIONAL INFORMATION