DESCRIPTION
Build up to 300 engineered and constructed logjams (ELJ's and CLJ's) in the anadromous reaches of the Dungeness River (river mile (RM) 0.0 to 18.8) and in the lower two miles of its major tributary, the Gray Wolf River. The project will include a series of design and construction phases occurring from 2024 to 2035.