Johnson Ck Triple Culvert Restoration 2022
#22-1084 #22-1084
 WRIA19 Hoko River Watershed Johnson Ck Triple Culvert Restoration 2022
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor North Olympic Salmon Coalition
Status Active
Schedule Start Date: 9/22/2022 End Date: 12/31/2025
Category Category: Restoration
Project Photo
DESCRIPTION
The Johnson Creek Triple Culverts project is a restoration project that seeks to construct the replacement of three adjacent, fish barrier culverts #80001261 with a fish passable structure to open access to 15.6 acres of summer and winter rearing as well as 2.4 linear miles of spawning and rearing habitat. This is NOPLES #1 ranked culvert project in the Pysht HUC 10. Replacement of these structures will re-connect hydraulic processes within a wetland that is currently bisected roughly in half. Johnson Creek is a Hoko River tributary . Chinook, coho, steelhead, cutthroat trout, and lamprey all inhabit this area and will benefit from the project. The Johnson B tributary runs along the southern road edge in the road ditch, for ~700 before meeting Johnson Creek at the culvert outlets. This Johnson B reach and the road negatively impact one another. Johnson B suffers from straightening, no no left bank riparian, no instream wood and is actively eroding road aggregate into the channel. The Johnson B tributary has historically contained some of the highest redd densities for the area (WDFW-SSI Database). Funds would go to construction of culvert replacements, and the relocation of the B-Tributary into the adjacent forest where we will reintroduce sinuosity, LWD habitat structures and pool riffle sequences. Construction of the project without moving Johnson B is impractical from culvert correction constructability, roadway maintenance, and salmon habitat benefit perspectives. 
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested02/10/2022Recreation and Conservation Office (RCO)Salmon State Projects$1,456,552.00
Requested02/10/2022North Olympic Salmon CoalitionMatch$3,284,728.00
Allocated07/21/2023Recreation and Conservation Office (RCO)Salmon State Supplemental Sm$366,797.00
Allocated07/21/2023Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$440,663.00
Allocated07/21/2023North Olympic Salmon CoalitionMatch$512,753.00
Allocated07/21/2023Recreation and Conservation Office (RCO)Salmon State Projects$649,092.00
Allocated07/21/2023Recreation and Conservation Office (RCO)BA Fish Barrier Removal Board$3,212,638.00
Spent11/07/2024North Olympic Salmon CoalitionMatch-$1,735.32
Spent11/07/2024Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$15,802.05
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$4,600,000.00 $4,741,280.00 $5,181,943.00 $17,537.37 $5,164,405.63
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Clallam
HUC12:Upper Hoko River (171100210703)
HUC8:Crescent-Hoko (17110021)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Puget Sound
Sections:23
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T31NR14W
Watershed Administrative Unit:Hoko
WRIA:Lyre - Hoko
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.13mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
2.40mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
3.00
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
2.40mi
Number of culverts (C.2.f.2)
5.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.13mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.00acres
Instream Pools Created/Added (C.4.c.6)
4.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.13mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.13mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.10mi
Number of structures placed in channel (C.4.d.7)
14.00
Pools Created through channel structure placement (C.4.d.5)
4.00
 Spawning gravel placement (C.4.f.1)    
Cubic Yards of spawning gravel placed (C.4.f.3)
437.00cubic yds
Miles of Stream Treated with spawning gravel placement (C.4.f.2)
0.10mi
ADDITIONAL INFORMATION