McDonald Creek Fish Passage Restoration
#20-1142 #20-1142
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor Clallam County
Status Active
Schedule Start Date: 9/23/2021 End Date: 12/31/2026
Category Category: Restoration
Project Photo
DESCRIPTION
The McDonald Creek Fish Passage project will rectify a long-known fish passage barrier and remove sources of fish mortality associated with operation of an irrigation diversion. The project will also improve habitat conditions, sediment, and wood transport in the creek. A small reinforced-concrete irrigation diversion dam with a Denil fishway is located at RM 3.2. Current site conditions are poor. A 2018 barrier assessment by WDFW documented that the dam is a complete barrier to fish and the Denil fishway was only deemed 33% passable for some adult fish. High velocity and turbulence likely make the existing fishway impassable to juveniles. All life stages of ESA-Listed Puget Sound Steelhead, as well as Coho, Cutthroat and Pacific Lamprey will benefit from this project. Improving fish passage will open up 4.5 and 6.1 miles of access to moderate to high quality habitat upstream of the dam for Coho and Steelhead, respectively, resulting in improved spawning and rearing habitat. The project will improve fish passage and enhance conditions for fish and wildlife while also improving Agnew Irrigation District's ability to divert water according to their water right. This will be achieved by notching the dam, installing a new fish passage structure, and constructing rock weirs and pools below the dam. The existing open diversion canal will be replaced by a buried pipeline with a new head gate and debris rack; and the existing fish screen will be relocated to the new head gate area.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested02/21/2020Clallam CountyMatch$105,580.00
Requested02/21/2020Recreation and Conservation Office (RCO)Salmon State Projects$406,415.00
Allocated07/01/2021Clallam CountyMatch$105,580.00
Allocated07/01/2021Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$406,415.00
Spent02/21/2025Clallam CountyMatch-$20,365.25
Spent02/21/2025Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$78,393.11
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$420,314.00 $511,995.00 $511,995.00 $98,758.36 $413,236.64
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Clallam
HUC12:McDonald Creek (171100200401)
HUC8:Dungeness-Elwha (17110020)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Puget Sound
Sections:18
Steelhead-Pop (ESU):Steelhead-Puget Sound, Strait of Juan de Fuca Tributaries, Threatened
Township:T30NR04W
Watershed Administrative Unit:Siebert McDonald
WRIA:Elwha - Dungeness
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.01mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
6.10mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
 Fish ladder installed / improved (C.2.e.1)    
Number of Fish Ladders Installed/Improved (C.2.e.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.00
Instream Flow Project    
Change In Water Flow (C.3.c)
Miles Of Stream 'Protected' For Adequate Flow (C.3.b)
 Irrigation practice improvement (C.3.e.1)    
Acre Feet Of Water Conserved (C.3.e.2)
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
Number of structures placed in channel (C.4.d.7)
Pools Created through channel structure placement (C.4.d.5)
ADDITIONAL INFORMATION