DESCRIPTION
North Olympic Salmon Coalition restored 1380 lineal feet of Sequim Bay beach, shoreline, and bluff, along the Eastern Strait of Juan de Fuca nearshore in Clallam County, WA, on land given by the Dawley family to the U.S. Fish and Wildlife Service for conservation. The 1.5 acre shoreline restoration included removal of 450 feet of armoring and bulkheads, fill, an overwater cabin, a pier, driveway, and septic system. More than 648 tons of fill was removed from the nearshore, along with 5.7 tons of tires. The shoreline was re-contoured to blend into undisturbed adjacent beaches and 8 large logs and 4 rootwads were placed. Native plants were installed on 4.7 acres of the marine riparian zone. This project repaired habitat-sustaining shoreline processes and improved migration and survival of juvenile salmon, especially Jimmycomelately Creek ESA- listed Hood Canal summer chum. This project was located close to Jimmy Comelately Creek (0.5 miles), Pitship Pocket Estuary (2.5 miles), and Washington Harbor (4.5 miles), where other restoration actions have been completed. This project also improved water quality within Sequim Bay by removing toxic creosoted pilings.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/13/2015North Olympic Salmon CoalitionMatch$70,629.00
Requested08/13/2015Recreation and Conservation Office (RCO)Salmon State Projects$400,221.00
Allocated12/11/2018North Olympic Salmon CoalitionMatch$39,569.40
Allocated12/11/2018Recreation and Conservation Office (RCO)Salmon Federal Projects$224,220.99
Spent10/12/2016Recreation and Conservation Office (RCO)Salmon State Projects-$0.00
Spent12/05/2018North Olympic Salmon CoalitionMatch-$39,569.40
Spent12/05/2018Recreation and Conservation Office (RCO)Salmon Federal Projects-$224,220.99
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$470,850.00 $470,850.00 $263,790.39 $263,790.39 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Strait of Juan de Fuca, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Clallam
HUC12:Discovery Bay-Strait of Juan De Fuca (171100200700)
HUC12:Johnson Creek-Frontal Sequim Bay (171100200203)
HUC8:Dungeness-Elwha (17110020)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Hood Canal
Sections:02
Steelhead-Pop (ESU):Steelhead-Puget Sound, Sequim/Discovery Bays Tributaries, Threatened
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T29NR03W
Watershed Administrative Unit:Sequim Bay
WRIA:Quilcene - Snow
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.09mi0.09mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
1.50acres7.00acres
 Debris removal (C.9.n.1)    
Acres Treated for debris removal (C.9.n.2)
0.20acres0.20acres
 Estuarine planting or native plant establishment (C.9.r.1)    
Acres of Estuarine planting or native plant establishment (C.9.r.3)
4.70acres4.90acres
 Overwater structure removal / modification (C.9.o.1)    
Acres Treated with overwater structure removal/modification (C.9.o.2)
0.30acres0.30acres
 Regrading of slope (C.9.i.1)    
Acres of Estuary Treated through slope regrading (C.9.i.2)
0.20acres0.20acres
 Removal of existing fill material (C.9.g.1)    
Acres of Estuary Treated through fill material removal (C.9.g.2)
0.30acres0.30acres
 Shoreline armor removal or modification (C.9.k.1)    
Acres of Shoreline Treated for armor modification/removal (C.9.k.3)
0.10acres0.10acres
Miles of Shoreline Treated for armor modification/removal (C.9.k.2)
0.09mi0.09mi