Schedule Start Date: 10/7/2010 End Date: 11/25/2015
Category Category: Restoration
Project Photo
DESCRIPTION
We constructed 15 ELJ's in the Elwha River phased under a four year construction project. In addition we placed freely place large wood in a 0.5 mile long side channel of the Elwha River The Elwha has been affected by dam construction in the early 20th century which eliminated 90% of the accessible stream habitat and truncated the alluvial transport of sediment and wood necessary for habitat restoration processes. Additionally the lower river has been negatively impacted by channelization, floodplain logging, wood clearing and other human activities. Removal of two hydroelectric dams was initiated in the fall of 2011. Dam removal was completed in the fall of 2014 and fluvially transported wood and sediment is rejuvenating floodplain and estuary habitats throughout the river. This project is an extension of the Tribes comprehensive efforts to restore the floodplain of the lower Elwha prior to dam removal. By the end of the construction season in 2014 the tribe has constructed 50 ELJs, added hundreds of free pieces of LWD to side channels, removed three push up dikes, corrected culvert barriers, planted 30,000 trees and controlled exotic vegetation between River Mile 0-3.0. This project extends restoration activities to a previously untreated portion of the river that has been impacted by historic channelization. This reach has lost significant sinuosity over the last 50 years and is characterized by high velocities and very large substrate. Floodplain habitats in the ELJ treatment reach are responding positively to dam removal and new side channels have been created. Pool structure is reforming following the initial burial of the channel immediately following dam removal. Large wood from upstream sources are being racked on the new ELJ's. ELJ's werer be sited and constructed to provide improved spawning and rearing habitats, reduce velocities and promote lateral connectivity between the mainstem and floodplain. This project has been identified on NOPLEG's three year priority list as the 2nd highest ranking project.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/21/2010Lower Elwha Klallam TribeMatch$102,000.00
Requested08/21/2010Recreation and Conservation Office (RCO)Salmon State Projects$578,048.00
Allocated11/25/2015Recreation and Conservation Office (RCO)Salmon Federal Projects$15,000.00
Allocated11/25/2015Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$60,459.00
Allocated11/25/2015Lower Elwha Klallam TribeMatch$187,017.96
Allocated11/25/2015Recreation and Conservation Office (RCO)Salmon State Projects$983,647.43
Spent03/05/2013Recreation and Conservation Office (RCO)Salmon Federal Projects-$15,000.00
Spent07/09/2013Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$60,459.00
Spent11/24/2015Lower Elwha Klallam TribeMatch-$187,017.96
Spent11/24/2015Recreation and Conservation Office (RCO)Salmon State Projects-$983,647.43
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$680,048.00 $680,048.00 $1,246,124.39 $1,246,124.39 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Elwha River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Clallam
HUC12:Lake Aldwell-Elwha River (171100200514)
HUC8:Dungeness-Elwha (17110020)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Puget Sound
Sections:03
Steelhead-Pop (ESU):Steelhead-Puget Sound, Elwha River, Threatened
Township:T30NR07W
Watershed Administrative Unit:Sutherland-Aldwell
WRIA:Elwha - Dungeness
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.50mi0.50mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.20mi0.50mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
1.00acres5.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.50mi0.50mi
Number of structures placed in channel (C.4.d.7)
6.0018.00
Pools Created through channel structure placement (C.4.d.5)
6.0015.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
150.00yd150.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
2.50acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.50mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.50acres