DESCRIPTION
The existing levee at Kinkade Island confines the channel for its entire length, greatly increasing stream energy in this reach and downstream reaches. This project will remove between 850 and 950 feet of riprap levee on the west side of Kinkade Island (approx. RM 9.75 on the Dungeness River), install LWD, and revegetate the site with native vegetation. Additionally, a portion of funding requested is for baseline monitoring. This project will directly benefit the reach in which the project occurs, as well as reaches downstream, by reducing overall stream energy, and reconnecting 17 acres of floodplain with the river. The project will be completed during spring low flow from February to April. This schedule will 1) minimize potential mortality of in-gravel eggs due to regrade of the river, 2) lower project costs since it is a time of year when contractors are more available, and 3) allow immediate revegetation of the project site upon completion. The project will benefit the majority of salmonid species in the Dungeness including Chinook, Coho, Summer and Fall Chum, Steelhead, Cutthroat, Dolly Varden and Bull Trout, by decreasing bed scour and allowing a more natural pool/riffle and meandering channel pattern to develop in this area - approx. 1300 ft. of channel length.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/16/1999Clallam County Community DevelopmentMatch$50,000.00
Requested07/16/1999Recreation and Conservation Office (RCO)Salmon State Projects$85,000.00
Allocated11/29/2000Clallam County Community DevelopmentMatch$9,777.16
Allocated11/29/2000Recreation and Conservation Office (RCO)Salmon State Projects$16,621.16
Spent11/29/2000Clallam County Community DevelopmentMatch-$9,777.16
Spent11/29/2000Recreation and Conservation Office (RCO)Salmon State Projects-$16,621.16
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$135,000.00 $135,000.00 $26,398.32 $26,398.32 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Dungeness River, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Strait of Juan de Fuca, Threatened
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Clallam
HUC12:Middle Dungeness River (171100200306)
HUC8:Dungeness-Elwha (17110020)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Hood Canal
Sections:02
Steelhead-Pop (ESU):Steelhead-Puget Sound, Dungeness River, Threatened
Township:T29NR04W
Watershed Administrative Unit:Dungeness Valley
WRIA:Elwha - Dungeness
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.17mi0.17mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.25mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.17mi0.17mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
Instream Pools Created/Added (C.4.c.6)
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
Miles of Stream Treated for channel structure placement (C.4.d.3)
Number of structures placed in channel (C.4.d.7)
Pools Created through channel structure placement (C.4.d.5)
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.00mi
Wetland Project    
Total Acres Of Wetland Area Treated (C.8.b)
0.00acres0.00acres
 Artificial wetland created (C.8.f.1)    
Artificial Wetland Acres Created (C.8.f.2)
20.00acres20.00acres
 Wetland plant removal / control (C.8.d.1)    
Acres of wetland treated for plant removal/control (C.8.d.3)
3.00acres3.00acres