Hoko River Salmon Habitat Restoration 2
#05-1664 #05-1664
 WRIA19 Hoko River Watershed Hoko River Salmon Habitat Restoration 2
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor Lower Elwha Klallam Tribe
Status Completed
Schedule Start Date: 1/6/2006 End Date: 8/21/2009
Category Category: Restoration
Project Photo
DESCRIPTION
Restoration work included removing a fish-blocking, 8-foot-diameter culvert and 3,500 cubic yards of fill, opening up nearly 1.5 miles of excellent salmon habitat on Creek 191. Crews also removed two log bridges that restricted the river channel's flow. A series of nine engineered log jams were installed in the river, using more than 300 large logs with root wads throughout the half-mile stretch of the restoration area. Nearly 100 more logs will be brought in by helicopter in September and placed within a one-mile reach of Ellis Creek, near its confluence with the river. The log additions will help create habitat important for young salmon in which to feed and rest as they make their way to the ocean.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/02/2007Lower Elwha Klallam TribeMatch$71,470.00
Requested07/02/2007Recreation and Conservation Office (RCO)Salmon State Projects$383,264.00
Allocated08/21/2009Lower Elwha Klallam TribeMatch$71,470.00
Allocated08/21/2009Recreation and Conservation Office (RCO)Salmon State Projects$341,017.33
Spent08/21/2009Lower Elwha Klallam TribeMatch-$71,470.00
Spent08/21/2009Recreation and Conservation Office (RCO)Salmon State Projects-$341,017.33
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$455,000.00 $454,734.00 $412,487.33 $412,487.33 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Clallam
HUC12:Upper Hoko River (171100210703)
HUC8:Crescent-Hoko (17110021)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Puget Sound
Sections:04
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T30NR13W
Watershed Administrative Unit:Hoko
WRIA:Lyre - Hoko
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
1.46mi1.46mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
1.10mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
2.00
Square Miles Of streambed made accessible (C.2.b.2)
3.50sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
3.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
1.10mi
Number of road-crossings (C.2.i.2)
3.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.65mi1.65mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
10.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
1.65mi
Number of structures placed in channel (C.4.d.7)
85.00
Pools Created through channel structure placement (C.4.d.5)
30.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
25.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.25mi0.25mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
2.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
1.00mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.00acres
Upland Habitat And Sediment Project    
Acres of Upland Habitat Area Treated (C.6.b.1)
1.20acres
Miles of Road Treated (C.6.b.2)
0.50mi
 Road abandonment (C.6.d.1)    
Miles of Road Abandoned (C.6.d.2)
0.50mi
ADDITIONAL INFORMATION