East Twin River LWD Placement
#00-1884 #00-1884
 WRIA19 Twin Rivers Watershed East Twin River LWD Placement
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor Lower Elwha Klallam Tribe
Status Completed
Schedule Start Date: 3/12/2001 End Date: 10/3/2006
Category Category: Restoration
Project Photo
DESCRIPTION
The Lower Elwha Klallam Tribe used this funding improve spawning and rearing conditions for coho salmon, chum salmon and steelhead trout in the East Twin River and its major tributary, Sadie Creek. This project placed large wood in the river and creek using ground-based and helicopter. In 2001 and 2002 we used ground-based equipment to place wood at 35 sites in East Twin River between river mile 0.3 and 2.0. This was followed by a helicopter placement project in the fall of 2002 for inaccessible portions of the drainage and included the East Twin River (miles 2.0 to 3.0) and Sadie Creek (river miles 0.2 to1.8). On a single flight, a leased Chinook helicopter placed 35 key pieces (weighing between 15,000-30,000 pounds each) in upper East Twin and 75 key pieces and or cut logs into Sadie Creek. Additionally the project planted one mile of riparian stream bank along the East Twin River with native conifers to improve habitat values and large wood recruitment over time.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested11/14/2000Lower Elwha Klallam TribeMatch$127,500.00
Requested11/14/2000Recreation and Conservation Office (RCO)Salmon State Projects$722,500.00
Allocated01/26/2001Lower Elwha Klallam TribeMatch$127,500.00
Allocated01/26/2001Recreation and Conservation Office (RCO)Salmon Federal Projects$722,500.00
Spent10/03/2006Lower Elwha Klallam TribeMatch-$127,500.00
Spent10/03/2006Recreation and Conservation Office (RCO)Salmon Federal Projects-$722,500.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$850,000.00 $850,000.00 $850,000.00 $850,000.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Clallam
HUC12:East Twin River (171100210302)
HUC8:Crescent-Hoko (17110021)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Puget Sound
Sections:23
Sections:36
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T31NR10W
Watershed Administrative Unit:Twin Rivers-Deep Creek
WRIA:Lyre - Hoko
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
5.00mi4.80mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
5.00mi4.80mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
15.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
6.60mi
Number of structures placed in channel (C.4.d.7)
160.00
Pools Created through channel structure placement (C.4.d.5)
60.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
35.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
20.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
1.50mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
20.00acres