Elwha River Estuary Restoration 2007
#07-1807 #07-1807
 WRIA18 West: Elwha River Watershed Lower Elwha River Elwha River Estuary Restoration 2007
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor Clallam County Community Development
Status Dormant
Schedule Start Date: 12/13/2007 End Date: 6/30/2011
Category Category: Restoration
Project Photo
DESCRIPTION
Dams and dikes built on the Elwha River have induced sediment starvation and severely disrupted habitat in its estuary. Dam removal through the Elwha Ecosystem Restoration project will reopen 70 miles of riverine habitat and reestablish river sediment processes, but does not restore the disrupted estuary functions that significantly impact the Elwha estuary and ecosystem. The Place Road (west) dike (co-owned by the Elwha Tribe and a private landowner) is a dominant limiting factor in the Elwha estuary. The resulting 7 acres of impounded west estuary are privately owned. Long-term estuary restoration goals for the Elwha estuary include conservation easements and additional dike modifications. SRFB-funded nearshore assessment work in the Elwha west estuary has led to private landowner interest in considering estuarine ecosystem scale restoration goals. Local landowners have a strong interest in restoring fish access to the estuary. This timely project has three components. It provides: 1. Fish passage to 7 acres of the Elwha west estuary via a minimum of one fish passage structure; 2. Initial scoping for feasibility of conservation easements for the west estuary; and 3. A one-year baseline survey to define current conditions of the estuary prior to fish passage installation, critical for ongoing citizen dialog. ESA-listed Puget Sound Chinook, bull trout, and steelhead; chum, pinks, cutthroat, and forage fish will benefit from reconnected river and estuary habitat.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested10/01/2007Clallam County Community DevelopmentMatch$56,000.00
Requested10/01/2007Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$267,000.00
Allocated07/27/2010Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$9,033.90
Allocated07/27/2010Clallam County Community DevelopmentMatch$13,000.00
Spent07/27/2010Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$9,033.90
Spent07/27/2010Clallam County Community DevelopmentMatch-$13,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$22,034.00 $323,000.00 $22,033.90 $22,033.90 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Elwha River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Clallam
HUC12:Lake Aldwell-Elwha River (171100200514)
HUC8:Dungeness-Elwha (17110020)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Puget Sound
Sections:27
Steelhead-Pop (ESU):Steelhead-Puget Sound, Elwha River, Threatened
Township:T31NR07W
Watershed Administrative Unit:Sutherland-Aldwell
WRIA:Elwha - Dungeness
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
7.00acres0.00acres
 Creation of new estuarine area (C.9.q.1)    
Acres of Estuary Created (C.9.q.2)
7.00acres0.00acres
 Debris removal (C.9.n.1)    
Acres Treated for debris removal (C.9.n.2)
0.00acres
 Estuarine plant removal / control (C.9.j.1)    
Acres of Estuary Treated for plant removal/control (C.9.j.3)
0.00acres0.00acres
 Regrading of slope (C.9.i.1)    
Acres of Estuary Treated through slope regrading (C.9.i.2)
0.00acres
 Shoreline armor removal or modification (C.9.k.1)    
Acres of Shoreline Treated for armor modification/removal (C.9.k.3)
0.00acres
Miles of Shoreline Treated for armor modification/removal (C.9.k.2)
0.00mi
 Tidegate alteration / removal (C.9.e.1)    
Acres opened To Fish Passage through tidegate alteration/removal (C.9.e.3)
0.00acres
Miles of stream made accessible by removal or modification of tidegate
Number of Tidegates Altered/Removed To Allow Fish Passage (C.9.e.2)
0.00
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.00mi0.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.000.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.00mi
Number of road-crossings (C.2.i.2)
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.36mi0.00mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.18mi0.00mi
ADDITIONAL INFORMATION