Tahuya River Estuary Preliminary Design
#12-03-89264 #12-03-89264
 Mason County- Tahuya Tahuya Estuary Restoration Tahuya River Estuary Preliminary Design
Organization Hood Canal Coordinating Council Lead Entity
Sponsor Hood Canal Salmon Enhancement Group (HCSEG)
Status Dormant
Schedule Start Date: 8/1/2016 End Date: 12/31/2018
Category Category: Planning
Project Photo
DESCRIPTION
This proposed project will build on the conceptual design alternatives presented by PSNERP by developing a preliminary 30% design. Replace the existing North Shore Road Bridge over the Tahuya River to restore normative tidal exchange, sediment and debris transport, and reconnect a historic distributary system. This project involves removing the existing 123 foot span bridge, removing fill material from within the tidal prism, installing a longer bridge to span the estuary, and revegetating fill removal areas. The project team will also investigate the feasibility of reconnecting a historic distributary channel system, and other identified habitat improvement elements as they are identified during the design process. Preliminary design development involves: topographic survey, geotechnical boring and analysis, structural engineering, civil/hydraulic engineering, cultural resource investigation, environmental research, landowner outreach, and project stakeholder coordination.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/22/2016Hood Canal Salmon Enhancement Group (HCSEG)Match$85,912.00
Requested07/22/2016Recreation and Conservation Office (RCO)Estuary & Salmon Restoration$200,462.00
Allocated12/27/2018Hood Canal Salmon Enhancement Group (HCSEG)Match$1,734.00
Allocated12/27/2018Recreation and Conservation Office (RCO)Estuary & Salmon Restoration$4,046.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$4,046.00 $286,374.00 $5,780.00 $0.00 $5,780.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Hood Canal, Threatened
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Mason
HUC12:Tahuya River (171100180104)
HUC8:Hood Canal (17110018)
Lead Entity Area:Hood Canal
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Hood Canal
Salmon Recovery Regions:Hood Canal
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Hood Canal Tributaries, Threatened
Watershed Administrative Unit:Great Bend
WRIA:Kitsap
View project on a larger map

Related Projects

  APPLICATION FINAL 
PLANNING METRICS
Area Encompassed (acres) (B.0.b.1)
2.50acres
Miles of Stream and/or Shoreline Affected (B.0.b.2)
0.50mi
ADDITIONAL INFORMATION