DESCRIPTION
This project will support the 5 US Army Corps of Engineers' ecosystem restoration projects. The 5 projects are a direct result of the Skokomish General Investigation and include: Skokomish South Fork LWD Installation, Confluence Levee Removal, River Mile 9 Levee Setback, Grange Levee Setback and Side Channel Reconnection. This project will support the completion of final designs for all 5 USACE projects (led by USACE), secure real estate necessary for implementing the 5 projects according to the Real Estate Plan and support implementation of the 5 USACE projects.
This project will support the 5 US Army Corps of Engineers' ecosystem restoration projects. The 5 projects are a direct result of the Skokomish General Investigation and include: Skokomish South Fork LWD Installation, Confluence Levee Removal, River Mile 9 Levee Setback, Grange Levee Setback and Side Channel Reconnection. This restoration component will support implementation of the 5 USACE projects. These projects will benefit listed Chinook, Hood Canal Summer Chum, Steelhead, and bull trout, as well as Coho and Cutthroat trout.