Salmon Estuary Wood Waste Removal and Restoration
#01-03-7260 #01-03-7260
 Jefferson County- Snow.Salmon Snow.Salmon Estuary Restoration Salmon Estuary Wood Waste Removal and Restoration
Organization Hood Canal Coordinating Council Lead Entity
Sponsor North Olympic Salmon Coalition
Status Completed
Schedule Start Date: 12/13/2007 End Date: 1/2/2013
Category Category: Acquisition & Restoration
Project Photo
DESCRIPTION
This project is designed to remove toxic leachate-producing wood waste from the nearshore environment and to increase the amount of estuarine habitat for juvenile salmonids, especially summer chum. Wood waste was placed atop the historic estuary at the head of Discovery Bay mid-century during a brief history of log peeling and veneer making at the site. Ground water seeping through the wood waste ‘leaches’ natural chemicals from the wood waste that become toxic in such large quantities. Leachates are creating toxic conditions for aquatic life in an existing tidal channel adjacent to the wood waste pile. In order to improve water quality, the wood waste must be removed prior to construction of the estuarine surface. Backfilling will be necessary to achieve the final elevation as the historic surface has subsided under the weight of the wood waste, and deeper areas suggest pits were dug to accommodate the wood waste. This project is critical to the success of other phases of estuarine restoration at this location. A fill removal and estuary restoration project was designed and funded to remove collapsing buildings and the fill they were built atop. Through soils investigations for that project, the wood waste problem was discovered. Removing wood waste will improve water quality in all phases of this project to support salmonids and their food web.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
RequestedNorth Olympic Salmon CoalitionMatch$113,337.00
RequestedRecreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$642,243.00
Allocated12/31/2012North Olympic Salmon CoalitionMatch$145,353.04
Allocated12/31/2012Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$484,543.40
Spent12/31/2012North Olympic Salmon CoalitionMatch-$145,353.04
Spent12/31/2012Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$484,543.40
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$629,896.44 $755,580.00 $629,896.44 $629,896.44 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Strait of Juan de Fuca, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Jefferson
HUC12:Beckett Point-Frontal Discovery Bay (171100200102)
HUC12:Discovery Bay-Strait of Juan De Fuca (171100200700)
HUC12:Eagle Creek-Frontal Discovery Bay (171100200103)
HUC12:Salmon Creek-Frontal Discovery Bay (171100200101)
HUC8:Dungeness-Elwha (17110020)
Lead Entity Area:Hood Canal
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Hood Canal
Sections:23
Sections:24
Steelhead-Pop (ESU):Steelhead-Puget Sound, Sequim/Discovery Bays Tributaries, Threatened
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T29NR02W
Watershed Administrative Unit:Discovery Bay
WRIA:Quilcene - Snow
View project on a larger map
  APPLICATION FINAL 
ACQUISTION METRICS
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition
0.20mi
 Land    
Acres by Acreage Type (fee simple)
Lake
Riparian
Tidelands
4.51
Uplands
2.00
Wetlands
Total
6.51
acres
 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.20mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
0.00acres10.80acres
 Channel modification (C.9.c.1)    
Acres of Estuary Treated (C.9.c.3)
0.20acres
 Contaminant removal / remediation (C.9.m.1)    
Acres Treated for contaminant removal/modification (C.9.m.2)
4.10acres
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
6.70acres
Miles Of Dikes Modified/Removed (C.9.d.2)
0.08mi
 Estuarine plant removal / control (C.9.j.1)    
Acres of Estuary Treated for plant removal/control (C.9.j.3)
1.00acres0.00acres
 Regrading of slope (C.9.i.1)    
Acres of Estuary Treated through slope regrading (C.9.i.2)
5.00acres
 Removal of existing fill material (C.9.g.1)    
Acres of Estuary Treated through fill material removal (C.9.g.2)
6.70acres
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
4.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.20mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
6.00acres
Site Stewardship Project    
 Restored land maintained (C.11.c.1)    
Acres of restored land maintained (C.11.c.2)
6.70acres
ADDITIONAL INFORMATION