Oakland Bay Estuary Conservation Phase 3
#12-1590 #12-1590
Organization Kennedy-Goldsborough Basin (WRIA 14) Salmon Recovery Lead Entity
Sponsor Capitol Land Trust
Status Completed
Schedule Start Date: 10/1/2013 End Date: 5/15/2018
Category Category: Acquisition & Restoration
DESCRIPTION
Capitol Land Trust acquired 74 acres of biologically sensitive and culturally significant estuary, near shore and riparian habitat on Oakland Bay, located in Mason County. They also restored the existing 48-acre golf course located on the property, converting it to native salt marsh, riparian forest, and other natural ecosystems appropriate to site hydrology, soils, geology, and climate, for priority species recovery. Restoration entailed removing 1,400 feet of supratidal dike along the shoreline to reconnect approximately 13 acres of saltmarsh; constructing tidal channels in the newly connected salt marsh to increase and diversify tidal habitat; constructing side channels along Johns Creek to increase off-channel habitat; removing bank armor and adding large wood along Johns Creek to improve instream habitat complexity; removing buildings, bridges, pathways, and other infrastructure related to the former golf course across the property; planting a wider, more functional riparian zone along Johns Creek; and planting a native plant forested buffer along the new tidal channels. In addition, the surface water right owned by the former golf course was retired and placed in the Washington Water Trust program in the Dept. of Ecology. When combined with the three other protected estuarine complexes on northern Oakland Bay, this property supports multiple priority habitat types (riparian, freshwater wetland, in-stream, Puget Sound near shore) that provide crucial habitat for multiple priority species including Chum, Chinook, and Coho salmon, steelhead, Cutthroat Trout, forage fish, migratory and resident shore birds, waterfowl, land bird species, and shellfish. The primary purpose of the project was habitat protection and restoration.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested05/01/2012Recreation and Conservation Office (RCO)WWRP-RPA-Riparian Protection$1,000,000.00
Requested05/01/2012Capitol Land TrustMatch$1,510,000.00
Allocated05/15/2018Recreation and Conservation Office (RCO)Salmon State Projects$50,385.00
Allocated05/15/2018Recreation and Conservation Office (RCO)Estuary & Salmon Restoration$67,000.00
Allocated05/15/2018Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$703,543.00
Allocated05/15/2018Recreation and Conservation Office (RCO)WWRP-RPA-Riparian Protection$951,876.16
Allocated05/15/2018Capitol Land TrustMatch$1,366,967.24
Spent12/21/2015Recreation and Conservation Office (RCO)Estuary & Salmon Restoration-$67,000.00
Spent06/17/2016Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$703,543.00
Spent01/04/2017Recreation and Conservation Office (RCO)Salmon State Projects-$50,385.00
Spent02/22/2018Recreation and Conservation Office (RCO)WWRP-RPA-Riparian Protection-$951,876.16
Spent02/22/2018Capitol Land TrustMatch-$1,366,967.24
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,772,804.16 $2,510,000.00 $3,139,771.40 $3,139,771.40 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Mason
HUC12:Cranberry Creek-Frontal Oakland Bay (171100190606)
HUC12:South Puget Sound (171100190900)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 14
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:03
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T20NR03W
Watershed Administrative Unit:Mason
WRIA:Kennedy - Goldsborough
View project on a larger map

Related Projects

  APPLICATION FINAL 
ACQUISTION METRICS
Incidentals    
 Fencing (Acq)    
Number of miles of fencing to be built
0.10mi0.10mi
 Noxious weed control    
Acres treated for noxious weeds by method
Biological
0.00
Chemical
0.00
Mechanical
4.00
Total
4.00
acres
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition
0.75mi0.75mi
 Land    
Acres by Acreage Type (fee simple)
Lake
Riparian
49.00
Tidelands
27.00
Uplands
Wetlands
Total
76.00
acres
Riparian
47.56
Tidelands
27.00
Total
74.56
acres
 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.55mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
10.90acres
 Channel modification (C.9.c.1)    
Acres of Estuary Treated (C.9.c.3)
2.00acres
Yards (linear measure) of Channel Modified/Created (C.9.c.2)
1,100.00yd650.00yd
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
13.00acres13.00acres
Miles Of Dikes Modified/Removed (C.9.d.2)
0.27mi0.27mi
 Estuarine planting or native plant establishment (C.9.r.1)    
Acres of Estuarine planting or native plant establishment (C.9.r.3)
10.90acres
Instream Flow Project    
Change In Water Flow (C.3.c)
0.07cfs
Miles Of Stream 'Protected' For Adequate Flow (C.3.b)
0.25mi
 Water leased or purchased (C.3.f.1)    
Acre Feet Of Water Purchased/Leased (C.3.f.2)
134.00acre-feet
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.28mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.20acres
Instream Pools Created/Added (C.4.c.6)
1.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.10mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.09mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.80acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.23mi
Number of structures placed in channel (C.4.d.7)
139.00
Pools Created through channel structure placement (C.4.d.5)
1.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
47.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.55mi
 Debris/structures removal (C.5.j.1)    
Acres of Riparian Area Treated. (C.5.j.2)
1.00acres
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
48.00acres15.20acres
Miles of streambank planted (C.5.c.4)
0.49mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
47.00acres
Miles of streambank treated for plant removal/control (C.5.h.4)
0.55mi