Collier Boat Ramp and Jetty
#13-1250 #13-1250
 Case Inlet / Pickering Passage Nearshore Collier Boat Ramp and Jetty
Organization Kennedy-Goldsborough Basin (WRIA 14) Salmon Recovery Lead Entity
Sponsor South Puget Sound Salmon Enhancement Group (SPSSEG)
Status Completed
Schedule Start Date: 12/4/2013 End Date: 3/11/2016
Category Category: Restoration
DESCRIPTION
South Puget Sound Salmon Enhancement Group (SPSSEG) removed the final two sediment barriers blocking lateral net shore-drift along 5.7 miles of Pickering Passage in South Puget Sound. SPSSEG removed a private boat ramp and decommissioned a large boat basin by removing its concrete wall extensions (groins) that trapped sediment, preventing it from reaching areas down-drift. The project site was rated as high priority for restoration by the Puget Sound Nearshore Ecosystem Restoration Project. It is hypothesized that removing the impediments to net shore-drift will result in increased spawning habitat for sandlance, surfsmelt and herring, all of which are important food sources for Puget Sound salmonid species. Sand lance have been documented spawning at and down-drift of the site over multiple years of sampling. The drift cell ends ΒΌ of a mile down-drift from the project area at the Squaxin Pass herring spawning site located at the mouth of Hammersley Inlet. The Squaxin Pass herring run is documented as one of only two stocks in Puget Sound found to be genetically distinct; it is used as an indicator for Puget Sound herring by the Puget Sound Partnership, which has set a goal of increasing its production to 880 tons by 2020.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/25/2013South Puget Sound Salmon Enhancement Group (SPSSEG)Match$28,975.00
Requested04/25/2013Recreation and Conservation Office (RCO)Salmon State Projects$164,190.00
Allocated10/07/2016South Puget Sound Salmon Enhancement Group (SPSSEG)Match$22,293.21
Allocated10/07/2016Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$118,753.17
Spent10/07/2016South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$22,293.21
Spent10/07/2016Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$118,753.17
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$193,165.00 $193,165.00 $141,046.38 $141,046.38 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Mason
HUC12:Schneider Creek-Frontal Totten Inlet (171100190601)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 14
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:28
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T20NR02W
Watershed Administrative Unit:Mason
WRIA:Kennedy - Goldsborough
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
0.50acres0.50acres
 Shoreline armor removal or modification (C.9.k.1)    
Acres of Shoreline Treated for armor modification/removal (C.9.k.3)
0.50acres0.50acres
Miles of Shoreline Treated for armor modification/removal (C.9.k.2)
0.10mi0.10mi